Permit Application Status

PRBD202413248


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202413248
Building
Finaled
MSP BLN OFFICE LLC
Business
Renovate existing 4 Tenant Spaces and convert to 1 tenant space by removing existing separation walls between suites 350, 355, 341 &346 to increase Tenant Space. Remove existing walls to create a completely new layout. Relocate Hall Entry/Exit Doors, add new walls to create a new reception/waiting area, office, student breakroom, student station, staff breakroom, 16 individual client bed spaces-enclose with curtains and track (no walls or doors on ends),and other treatment rooms and storage areas.
10/07/2024
11/22/2024
08/17/2025
02/18/2025

Locations

Permits

Permit Number: PRBD202413248

Building
Finaled
11/22/2024
08/17/2025

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 12/9/2024 (8:00 - 10:00) 12/9/2024 (AM) 12/09/2024
Corrections:


Miscellaneous/Other
Comment Only
12/09/2024
Interior framing approved and ok to cover one side only. Electrical inspection to be performed, backing, door insets to be built, and firestops to be completed... call in for another framing inspection.

Above Ceiling Inspection Passed 12/19/2024
Corrections:


Miscellaneous/Other
Comment Only
12/19/2024
Above ceiling / ceiling framing and fire stops... approved

Progress Inspection Passed 1/24/2025 (12:30 - 2:30) 1/24/2025 (PM) 01/24/2025
Corrections:


Miscellaneous/Other
Comment Only
01/24/2025
This was a walkthrough for future turnover, all looks compliant to accessibility and building code pending the installation of exit signage.

Framing Inspection Passed 1/24/2025 (12:30 - 2:30) 1/24/2025 (PM) 01/24/2025
Corrections:


Miscellaneous/Other
Comment Only
01/24/2025
Progress framing of the horizontal rated shaft enclosure at 3rd floor plenum ceiling and enclosure at 4th floor from floor to roof... approved

Progress Inspection Passed 01/27/2025
Corrections:


Miscellaneous/Other
Comment Only
01/27/2025
Progress of horizontal assembly for dryer venting and enclosure for through floor and roof on 4th floor... approved

Building Final Inspection Not Ready 1/27/2025 (2:30 - 3:30) 1/27/2025 (PM) 01/27/2025
Corrections:


Miscellaneous/Other
Comment Only
01/27/2025
Not ready for final inspection

Fire Inspection Final Not Ready 1/27/2025 (2:30 - 3:30) 1/27/2025 (PM) 01/28/2025
Cancel
Building Final Inspection Not Ready 1/28/2025 (2:30 - 3:30) 1/28/2025 (PM) 01/28/2025
Corrections:


Miscellaneous/Other
Carried Forward
01/28/2025
1) Sprinkler permit to be obtained and inspection of system needed. 2) Mag holds to be tested in conjugation with fire alarm activation. 3) mechanical to recheck function on the dryers and inline fans. 4) access panels in horizontal assembly to be rated access panels, there should be a marking that states this. 5) firecaulk the wiring penetrations at horizontal assembly by the first access panel. Recheck of above items is scheduled for 1/31 Ok to continue setup of space.

Fire Inspection Final Not Ready 1/28/2025 (2:30 - 3:30) 1/28/2025 (PM) 01/28/2025
Corrections:


Miscellaneous/Other
Carried Forward
01/28/2025
Sprinklers not checked, fire alarm must drop mag door and push button installed.

Fire Inspection Final Issue TCO 1/31/2025 (8:00 - 10:00) 1/31/2025 (AM) 01/31/2025
Building Final Inspection Partial Pass 1/31/2025 (8:00 - 10:00) 1/31/2025 (AM) 01/31/2025
Corrections:


Miscellaneous/Other
Comment Only
01/31/2025
Approved for temporary occupancy pending sprinkler permit and inspection. Notify inspector when final has been done on the sprinkler permit.

Fire Inspection Final Passed 02/18/2025
Corrections:


Miscellaneous/Other
Outstanding
01/28/2025
Sprinklers not checked, fire alarm must drop mag door and push button installed.

Fire Inspection Final Passed 02/18/2025
Building Final Inspection Passed 02/18/2025
Corrections:


Miscellaneous/Other
Resolved
02/18/2025
1) Sprinkler permit to be obtained and inspection of system needed. 2) Mag holds to be tested in conjugation with fire alarm activation. 3) mechanical to recheck function on the dryers and inline fans. 4) access panels in horizontal assembly to be rated access panels, there should be a marking that states this. 5) firecaulk the wiring penetrations at horizontal assembly by the first access panel. Recheck of above items is scheduled for 1/31 Ok to continue setup of space.

Miscellaneous/Other
Comment Only
02/18/2025
Corrections completed. Final for this scope of work and permit... approved