PRBD202413248
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Framing Inspection | Partial Pass | 12/9/2024 (8:00 - 10:00) | 12/9/2024 (AM) | 12/09/2024 |
|
Corrections:
Miscellaneous/Other
Comment Only
12/09/2024
Interior framing approved and ok to cover one side only. Electrical inspection to be performed, backing, door insets to be built, and firestops to be completed... call in for another framing inspection.
|
||||
| Above Ceiling Inspection | Passed | 12/19/2024 | ||
|
Corrections:
Miscellaneous/Other
Comment Only
12/19/2024
Above ceiling / ceiling framing and fire stops... approved
|
||||
| Progress Inspection | Passed | 1/24/2025 (12:30 - 2:30) | 1/24/2025 (PM) | 01/24/2025 |
|
Corrections:
Miscellaneous/Other
Comment Only
01/24/2025
This was a walkthrough for future turnover, all looks compliant to accessibility and building code pending the installation of exit signage.
|
||||
| Framing Inspection | Passed | 1/24/2025 (12:30 - 2:30) | 1/24/2025 (PM) | 01/24/2025 |
|
Corrections:
Miscellaneous/Other
Comment Only
01/24/2025
Progress framing of the horizontal rated shaft enclosure at 3rd floor plenum ceiling and enclosure at 4th floor from floor to roof... approved
|
||||
| Progress Inspection | Passed | 01/27/2025 | ||
|
Corrections:
Miscellaneous/Other
Comment Only
01/27/2025
Progress of horizontal assembly for dryer venting and enclosure for through floor and roof on 4th floor... approved
|
||||
| Building Final Inspection | Not Ready | 1/27/2025 (2:30 - 3:30) | 1/27/2025 (PM) | 01/27/2025 |
|
Corrections:
Miscellaneous/Other
Comment Only
01/27/2025
Not ready for final inspection
|
||||
| Fire Inspection Final | Not Ready | 1/27/2025 (2:30 - 3:30) | 1/27/2025 (PM) | 01/28/2025 |
| Cancel | ||||
| Building Final Inspection | Not Ready | 1/28/2025 (2:30 - 3:30) | 1/28/2025 (PM) | 01/28/2025 |
|
Corrections:
Miscellaneous/Other
Carried Forward
01/28/2025
1) Sprinkler permit to be obtained and inspection of system needed.
2) Mag holds to be tested in conjugation with fire alarm activation.
3) mechanical to recheck function on the dryers and inline fans.
4) access panels in horizontal assembly to be rated access panels, there should be a marking that states this.
5) firecaulk the wiring penetrations at horizontal assembly by the first access panel.
Recheck of above items is scheduled for 1/31
Ok to continue setup of space.
|
||||
| Fire Inspection Final | Not Ready | 1/28/2025 (2:30 - 3:30) | 1/28/2025 (PM) | 01/28/2025 |
|
Corrections:
Miscellaneous/Other
Carried Forward
01/28/2025
Sprinklers not checked, fire alarm must drop mag door and push button installed.
|
||||
| Fire Inspection Final | Issue TCO | 1/31/2025 (8:00 - 10:00) | 1/31/2025 (AM) | 01/31/2025 |
| Building Final Inspection | Partial Pass | 1/31/2025 (8:00 - 10:00) | 1/31/2025 (AM) | 01/31/2025 |
|
Corrections:
Miscellaneous/Other
Comment Only
01/31/2025
Approved for temporary occupancy pending sprinkler permit and inspection.
Notify inspector when final has been done on the sprinkler permit.
|
||||
| Fire Inspection Final | Passed | 02/18/2025 | ||
|
Corrections:
Miscellaneous/Other
Outstanding
01/28/2025
Sprinklers not checked, fire alarm must drop mag door and push button installed.
|
||||
| Fire Inspection Final | Passed | 02/18/2025 | ||
| Building Final Inspection | Passed | 02/18/2025 | ||
|
Corrections:
Miscellaneous/Other
Resolved
02/18/2025
1) Sprinkler permit to be obtained and inspection of system needed.
2) Mag holds to be tested in conjugation with fire alarm activation.
3) mechanical to recheck function on the dryers and inline fans.
4) access panels in horizontal assembly to be rated access panels, there should be a marking that states this.
5) firecaulk the wiring penetrations at horizontal assembly by the first access panel.
Recheck of above items is scheduled for 1/31
Ok to continue setup of space.
|
||||
|
Miscellaneous/Other
Comment Only
02/18/2025
Corrections completed. Final for this scope of work and permit... approved
|
||||