PRBD202413507
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Partial Pass | 11/12/2024 (8:00 - 10:00) | 11/12/2024 (AM) | 11/12/2024 |
See corrections. | ||||
Corrections:
Miscellaneous/Other
Outstanding
11/12/2024
A.Fire caulk all ceiling and floor penetrations as discussed from below.
B. Fire caulk all existing and new electrical floor poke thru recepticals from below.
C. Framing, Partial pass, call for reinspection of fire caulk floor/ceiling penetrations.
|
||||
Framing Inspection | Passed | 12/13/2024 (8:00 - 10:00) | 12/13/2024 (AM) | 12/13/2024 |
Corrections:
Miscellaneous/Other
Outstanding
11/12/2024
A.Fire caulk all ceiling and floor penetrations as discussed from below
B. Fire caulk all existing and new electrical floor poke thru recepticals.
|
||||
Above Ceiling Inspection | Passed | 12/13/2024 (8:00 - 10:00) | 12/13/2024 (AM) | 12/13/2024 |
Fire Inspection Final | Passed w/ Conditions | 2/27/2025 (12:30 - 2:30) | 2/27/2025 (PM) | 02/26/2025 |
Shall install an additional 2A:10BC fire extinguisher. | ||||
Building Final Inspection | Passed | 2/27/2025 (12:30 - 2:30) | 2/27/2025 (PM) | 02/27/2025 |
Building final, passed. Fifth floor. | ||||
Corrections:
Miscellaneous/Other
Comment Only
02/27/2025
Building final, 5th floor.passed.
|