PRBD202414216
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Fire Inspection Final | Passed | 1/27/2025 (8:00 - 10:00) | 1/27/2025 (AM) | 01/27/2025 |
Building Final Inspection | Not Ready | 1/27/2025 (8:00 - 10:00) | 1/27/2025 (AM) | 01/27/2025 |
Corrections:
Miscellaneous/Other
Carried Forward
01/27/2025
Accessibility is not compliant with this Kiosk.
If ramp is to be used it needs to be wider, space around center cabinet does not allow wheel chair maneuvering or access.
If no access into kiosk for handicapped persons, then the cashwrap counter needs to be lowered to comply with accessibility, measured from mallfinished floor to top of counter.
Due to this being a raised platform and it appears to have entry from many areas, this may be considered a step... in which case a handrail will be required.
Please adjust as necessary and call for reinspection.
|
||||
Building Final Inspection | Passed w/ Conditions | 1/29/2025 (12:30 - 2:30) | 1/29/2025 (PM) | 01/29/2025 |
Corrections:
Miscellaneous/Other
Resolved
01/29/2025
Accessibility is not compliant with this Kiosk.
If ramp is to be used it needs to be wider, space around center cabinet does not allow wheel chair maneuvering or access.
If no access into kiosk for handicapped persons, then the cashwrap counter needs to be lowered to comply with accessibility, measured from mallfinished floor to top of counter.
Due to this being a raised platform and it appears to have entry from many areas, this may be considered a step... in which case a handrail will be required.
Please adjust as necessary and call for reinspection.
|
||||
Miscellaneous/Other
Comment Only
01/29/2025
Accessibility is compliant on inside of the kiosk style space.
The raised platform is a step up from the mall floor by 2.5" and the design was for people to enter at any opening. This would not comply with code requirements.
Now that it is brought to the attention of the mall , they will place weighted objects at the openings to block access in and out of the openings (not including the ramped opening). This will be sufficient to comply with the code requirements. A recheck of this will be done when the objects are in place.
This kiosk build is approved for final pending the follow-up inspection.
|