Summary

PRBD202414759
Building
Permit(s) Issued
BLMGTN SCHOOL DIST #271
Alteration/Repair/Replace
Not Required
The overall project consists of this project is a multi-phase project starting in June of 2025 and completing in August 2027. This project includes replacement of windows, replacement of hot water and chilled water piping, new air handling units, new hot water boilers, new ductwork, remodel of existing locker rooms, kitchen upgrades, bathroom upgrades, flooring replacement, electrical upgrades, lighting upgrades, ceiling replacement, replacement of doors, and new paint throughout the school.
11/06/2024
06/26/2025
08/30/2026

Locations

Permits

Permit Number: PRBD202414759

Building
Issued
06/26/2025
08/30/2026

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Building Final Inspection Pending
Fire Inspection Final Pending
Framing Inspection Passed 7/3/2025 (10:00 - 12:00) 7/3/2025 (AM) 07/03/2025
Corrections:


Miscellaneous/Other
Comment Only
07/03/2025
Several miscellaneous framing issues on both main level and lower level approved. Note, drinking fountain cane guards will be required on fountains, protruding into hallway.

Above Ceiling Inspection Passed 7/22/2025 (8:00 - 10:00) 7/22/2025 (AM) 07/22/2025
Corrections:


Miscellaneous/Other
Comment Only
07/22/2025
Above ceiling progress inspection of both levels approved

Building Final Inspection Issue TCO 8/21/2025 (8:00 - 10:00) 8/21/2025 (AM) 08/21/2025
Corrections:


Miscellaneous/Other
Comment Only
08/21/2025
20 day temporary occupancy for use by faculty only approved contingent on temporary occupancy being issued by electrical inspector. Call for final when ready.

Fire Inspection Final Partial Pass 8/27/2025 (12:30 - 2:30) 8/27/2025 (PM) 08/26/2025
Fire Inspection Final Partial Pass 8/20/2025 (12:30 - 2:30) 8/20/2025 (PM) 08/26/2025
Fire Inspection Final Partial Pass 8/27/2025 (12:30 - 2:30) 8/27/2025 (PM) 08/28/2025
Phase 1A
Building Final Inspection Partial Pass 8/28/2025 (10:00 - 12:00) 8/28/2025 (AM) 08/28/2025
Corrections:


Miscellaneous/Other
Comment Only
08/28/2025
Partial occupancy approved for phase 1A of multi phase project.

Framing Inspection Passed 9/9/2025 (8:00 - 10:00) 9/9/2025 (AM) 09/09/2025
Main level-A wing
Corrections:


Miscellaneous/Other
Comment Only
09/09/2025
Framing for restroom and wall in room 202C, approved.

Progress Inspection Passed 9/24/2025 (10:00 - 12:00) 9/24/2025 (AM) 09/24/2025
Corrections:


Miscellaneous/Other
Comment Only
09/24/2025
Progress inspection of above ceiling, fire caulking at rated corridor walls approved.

Building Final Inspection Partial Pass 10/10/2025 (8:00 - 10:00) 10/10/2025 (AM) 10/10/2025
Corrections:


Miscellaneous/Other
Comment Only
10/10/2025
Partial final approved for phase 1B.

Fire Inspection Final Partial Pass 10/13/2025 (8:00 - 10:00) 10/13/2025 (AM) 10/13/2025
"A" wing 200 classrooms except for A208 needs to add notification device.
Building Final Inspection Partial Pass 12/22/2025 (8:00 - 10:00) 12/22/2025 (AM) 12/22/2025
Corrections:


Miscellaneous/Other
Comment Only
12/22/2025
Final approved for wing in phase 1 – C only.

Fire Inspection Final Partial Pass 12/24/2025 (8:00 - 10:00) 12/24/2025 (AM) 12/29/2025
Lower level A-wing approved. Needs to repair smoke rated wall above A103.
Framing Inspection Passed 2/4/2026 (8:00 - 10:00) 2/4/2026 (AM) 02/04/2026
Corrections:


Miscellaneous/Other
Comment Only
02/04/2026
Phase 1-D, toilet rooms framing approved.

Progress Inspection Passed 2/19/2026 (8:00 - 10:00) 2/19/2026 (AM) 02/19/2026
Corrections:


Miscellaneous/Other
Comment Only
02/19/2026
Reviewed on site rated wall in classroom above ceiling requiring fire caulk repairs. Proceed as discussed and call for inspection when ready.

Progress Inspection Passed 3/3/2026 (10:00 - 12:00) 3/3/2026 (AM) 03/03/2026
Corrections:


Miscellaneous/Other
Comment Only
03/03/2026
Reviewed exiting needs on site with contractor to accommodate temporary blocking of one exit at basketball court. OK to proceed as discussed in field. Called for inspection when barricades installed.