PRBD202416157
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Building Final Inspection | Pending | |||
| Footing Inspection | Passed | 11/21/2025 (10:00 - 12:00) | 11/21/2025 (AM) | 11/21/2025 |
| Inspection today is approved for the first 24 footings for the fence. The other footing that were dug out and notied there were some wires inside the footing. The contractor needs to contact possibly Excel to get the all clear to pour the last remaining footings. | ||||
|
Corrections:
Miscellaneous/Other
Comment Only
11/21/2025
Inspection today is approved for the first 24 footings for the fence. The other footing that were dug out and notied there were some wires inside the footing. The contractor needs to contact possibly Excel to get the all clear to pour the last remaining footings.
|
||||
| Footing Inspection | Passed | 12/2/2025 (8:00 - 10:00) | 12/2/2025 (AM) | 12/02/2025 |
|
Corrections:
Miscellaneous/Other
Comment Only
12/02/2025
Footings along the 28th st location.... footings have been hydro vac'd to and beyond proposed depth, some wiring is present in some of the holes.
The power pompany gave a proposal to contractor to fill holes with sand just above the wiring that is present, there will b at least a 3-4 ft footing for the fence posts.
The footings along this line for the wood fence are approved.
|
||||