Summary

PRBD202416412
Building
Finaled
EMPIRE IV BLOOMINGTON LLC
Alteration/Repair/Replace
Not Required
Repairing drywall and finishes in a approximately 60 units due to water damage. No structural work and no new framing.
12/18/2024
12/30/2024
08/18/2025
02/19/2025

Locations

Permits

Permit Number: PRBD202416412

Building
Finaled
12/30/2024
08/18/2025

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Investigation Inspection Passed 12/31/2024 (12:30 - 2:30) 12/31/2024 (PM) 12/31/2024
Corrections:


Miscellaneous/Other
Comment Only
12/31/2024
Went over requirements for the work that is to take place. Went over inspection requirements as well. The units we looked at for this walk through are approved to recover the damaged areas.

Insulation Inspection Passed 1/7/2025 (8:00 - 10:00) 1/7/2025 (AM) 01/07/2025
Sheet rock and insulation
Corrections:


Miscellaneous/Other
Comment Only
01/07/2025
Viewed units 820,834,832,93,1023,1033, & 1034 framing, any insulation installed, and gypsum layers... approved. Units 932,934, & 1032 are completed and approved.

Building Final Inspection Passed 1/13/2025 (10:00 - 12:00) 1/13/2025 (AM) 01/13/2025
Corrections:


Miscellaneous/Other
Comment Only
01/13/2025
Units approved for final and occupancy... 1032,1030,1028,1020,931,920,921,922 Unit 929 needs smoke detector or coverplat installed to open electrical at kitchen ( there is a detector in the sleeping area that is all this unit requires), and smoke seal at entry door.

Fire Inspection Final Passed 1/13/2025 (10:00 - 12:00) 1/13/2025 (AM) 01/15/2025
Building Final Inspection Partial Pass 1/17/2025 (12:30 - 2:30) 1/17/2025 (PM) 01/17/2025
Corrections:


Miscellaneous/Other
Comment Only
01/17/2025
Units 924,831,830,829,821,822,823,828 are approved for final and occupancy.

Building Final Inspection Passed 02/19/2025
Corrections:


Miscellaneous/Other
Comment Only
02/19/2025
All units and common areas of the affected areas of the building that was damaged by water, are completed and are approved for final. Final of this permit approved.

Progress Inspection Passed 2/19/2025 (8:00 - 10:00) 2/19/2025 (AM) 02/19/2025
Corrections:


Miscellaneous/Other
Comment Only
02/19/2025
See final inspection dated 2/19/25, final approved