PRBD202416614
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Framing Inspection | Passed w/ Conditions | 1/23/2025 (8:00 - 10:00) | 1/23/2025 (AM) | 01/23/2025 |
|
Corrections:
Miscellaneous/Other
Outstanding
01/23/2025
Need to verify fire stop if removed shower drain. Contractor to send photo of the packed in place mineral wool in the existing fire stop sleeve.
|
||||
|
Miscellaneous/Other
Comment Only
01/23/2025
Framing approved.
Note⦠see corrections for fire stop verification.
|
||||
| Fire Inspection Final | Passed | 2/13/2025 (8:00 - 10:00) | 2/13/2025 (AM) | 02/13/2025 |
| Building Final Inspection | Passed | 2/13/2025 (8:00 - 10:00) | 2/13/2025 (AM) | 02/13/2025 |