PRBD202500302
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Insulation Inspection | Pending | |||
Lath Inspection | Pending | |||
Gypsum Board/Sheet Rock Inspection | Pending | |||
Erosion Control Inspection | Pending | |||
Building Final Inspection | Pending | 10/10/2025 (12:30 - 2:30) | 10/10/2025 (PM) | |
Landscaping Inspection | Pending | 10/31/2025 | ||
Footing Inspection | Passed | 6/18/2025 (8:00 - 10:00) | 6/18/2025 (AM) | 06/18/2025 |
Corrections:
Miscellaneous/Other
Comment Only
06/18/2025
Strip footings with rebar as per plan for structure at Northwest corner, Johnson Avenue approved.
|
||||
Framing Inspection | Passed | 7/21/2025 (12:30 - 2:30) | 7/21/2025 (PM) | 07/21/2025 |
Corrections:
Miscellaneous/Other
Comment Only
07/21/2025
Roof framing/ trusses and holddowns.. appoved
|
||||
Framing Inspection | Passed | 7/31/2025 (8:00 - 10:00) | 7/31/2025 (AM) | 07/31/2025 |
Metal stud framing for Concession stand ceiling approved | ||||
Corrections:
Miscellaneous/Other
Comment Only
07/31/2025
Metal stud framing for concessions stand ceiling approved.
|
||||
Footing Inspection | Passed | 8/1/2025 (10:00 - 12:00) | 8/1/2025 (AM) | 08/01/2025 |
Corrections:
Miscellaneous/Other
Comment Only
08/01/2025
Retaining wall footing at northeast corner of field with rebar as per plan approved. Note, submit special inspectors summary report at final inspection.
|
||||
Footing Inspection | Passed | 8/5/2025 (8:00 - 10:00) | 8/5/2025 (AM) | 08/05/2025 |
Corrections:
Miscellaneous/Other
Comment Only
08/05/2025
Two pad footings for entry wall at northwest corner as per drawings, approved.
|
||||
Progress Inspection | Passed | 8/6/2025 (10:00 - 12:00) | 8/6/2025 (AM) | 08/06/2025 |
Corrections:
Miscellaneous/Other
Comment Only
08/06/2025
Foundation wall/retaining wall with rebarapproved.
|
||||
Footing Inspection | Passed | 8/7/2025 (10:00 - 12:00) | 8/7/2025 (AM) | 08/07/2025 |
Corrections:
Miscellaneous/Other
Comment Only
08/07/2025
Foundation walls for entry gate at Northwest corner approved.
|
||||
Progress Inspection | Passed | 8/14/2025 (12:30 - 2:30) | 8/14/2025 (PM) | 08/14/2025 |
Corrections:
Miscellaneous/Other
Comment Only
08/14/2025
120 ft of poured wall, epoxy coated rebar as per design... approved
|
||||
Progress Inspection | Passed | 9/2/2025 (2:30 - 3:30) | 9/2/2025 (PM) | 09/02/2025 |
Corrections:
Miscellaneous/Other
Comment Only
09/02/2025
Slab on grade with epoxy coated rebar as per plan design... approved
|
||||
Building Final Inspection | Not Ready | 9/9/2025 (12:30 - 2:30) | 9/9/2025 (PM) | 09/09/2025 |
Corrections:
Miscellaneous/Other
Comment Only
09/09/2025
Went over the progress and sequencing of the project with contractor to gage what will be completed in order for a Temp occupancy of the site.
Concrete will be placed and ready for all the path entry/ exits of the field and to the concession area. Remainder site area will be outlined with snow fencing to to define the areas in which work is ongoing.
Accessible parking signs have been installed to the designated parking and unloading stalls.
Bleacher inspection is scheduled for 9/10/25.
Final inspection is not quite ready at this time, but would be ready for Temp by end of week.
|
||||
Fire Inspection Final | Passed | 9/10/2025 (10:00 - 12:00) | 9/10/2025 (AM) | 09/10/2025 |
Owner to provide fire extinguisher inside press box and concession building. | ||||
Building Final Inspection | Issue TCO | 9/10/2025 (10:00 - 12:00) | 9/10/2025 (AM) | 09/10/2025 |
Corrections:
Miscellaneous/Other
Outstanding
09/10/2025
1. Need fire extinguishers as required on plan. Obtain fire inspection approval. 2. Provide protection for accessible ramp edges from parking lot to bleachers as discussed. 3. Temporary occupancy approved for use of bleachers, conditional on completion of items one and two above. Call for final when ready.
|
||||
Progress Inspection | Passed | 09/12/2025 | ||
Corrections:
Miscellaneous/Other
Comment Only
09/12/2025
Epoxy coated rear for for sidewalk with a turned down footing on one side and tied into poured wall on the other side is as per plans... approved to place concrete.
|
||||
Building Final Inspection | Partial Pass | 9/16/2025 (8:00 - 10:00) | 9/16/2025 (AM) | 09/16/2025 |
Corrections:
Miscellaneous/Other
Comment Only
09/16/2025
Follow up inspection for protective fencing for accessible ramp approved. Call four final when landscaping complete.
|
||||
Lighting Inspection | Passed | 9/26/2025 | 09/29/2025 |