Permit Application Status

PRBD202500948


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202500948
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Not Required
Install demise wall S110 into two tenant spaces creating space S114 114 SOUTH AVE, BLOOMINGTON, MN 55425
01/29/2025
02/13/2025
09/16/2025
03/20/2025

Locations

Property
0102724310017

Address
110 SOUTH AVE, BLOOMINGTON, MN 55425

114 South Ave, Bloomington, MN 55425

Permits

Permit Number: PRBD202500948

Building
Finaled
02/13/2025
09/16/2025

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Passed 02/25/2025
Corrections:


Miscellaneous/Other
Comment Only
02/25/2025
Demising wall at 110/114 space framing... approved

Building Final Inspection Partial Pass 3/7/2025 (10:00 - 12:00) 3/7/2025 (AM) 03/07/2025
Corrections:


Miscellaneous/Other
Carried Forward
03/07/2025
Approved for temp to stock and set up only. See corrections to be completed for final inspection. Corrections... 1) expose all tape covered sprinkler heads, and put a fixed head in place of the tied up flex head in storage room. 2) install wider theshhold or build up the finish floor at rear exit to comply with ramps. 3) turn 2 exit signs 180 degrees so they read "Exit". 4) install smoke seal and closer to door/ frame of storage room 5) remove and support hanging duct in storage room or property support it. 6) properly mount the fire alarm at ceiling of back hallway.

Fire Inspection Final Partial Pass 3/7/2025 (10:00 - 12:00) 3/7/2025 (AM) 03/11/2025
Fire Inspection Final Passed 3/20/2025 (8:00 - 10:00) 3/20/2025 (AM) 03/20/2025
Building Final Inspection Passed 3/20/2025 (8:00 - 10:00) 3/20/2025 (AM) 03/20/2025
Corrections:


Miscellaneous/Other
Resolved
03/20/2025
Approved for temp to stock and set up only. See corrections to be completed for final inspection. Corrections... 1) expose all tape covered sprinkler heads, and put a fixed head in place of the tied up flex head in storage room. 2) install wider theshhold or build up the finish floor at rear exit to comply with ramps. 3) turn 2 exit signs 180 degrees so they read "Exit". 4) install smoke seal and closer to door/ frame of storage room 5) remove and support hanging duct in storage room or property support it. 6) properly mount the fire alarm at ceiling of back hallway.

Miscellaneous/Other
Comment Only
03/20/2025
Final for this tenant space approved, and ok to oen to public.