Permit Application Status

PRBD202500980


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202500980
Building
Finaled
ENGELSMA LLOYD
Alteration/Repair/Replace
Not Required
Interior tenant finish out of an 7,941 SF lease space in an existing shell building for a salon suites business. Demo portion of adjacent tenant space and create accessible restroom in that space (this will be a vacant tenant space for lease).
01/30/2025
04/29/2025
03/25/2026
09/26/2025

Locations

Permits

Permit Number: PRBD202500980

Building
Finaled
04/29/2025
03/25/2026

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Passed 6/18/2025 (2:30 - 3:30) 6/18/2025 (PM) 06/18/2025
Corrections:


Miscellaneous/Other
Comment Only
06/18/2025
Framing of rooms at hallway to dimising wall on west side and dimising wall at east side... approved

Framing Inspection Passed 6/26/2025 (12:30 - 2:30) 6/26/2025 (PM) 06/26/2025
Corrections:


Miscellaneous/Other
Comment Only
06/26/2025
Framing approved, ok to cover all walls.

Framing Inspection Passed 7/9/2025 (12:30 - 2:30) 7/9/2025 (PM) 07/09/2025
Corrections:


Miscellaneous/Other
Comment Only
07/09/2025
All framing approved .

Above Ceiling Inspection Passed 8/15/2025 (12:30 - 2:30) 8/15/2025 (PM) 08/15/2025
Corrections:


Miscellaneous/Other
Comment Only
08/15/2025
Ceiling framing and supports, and above ceiling... approved. Ok to pad out ceiling.

Fire Inspection Final Passed 9/25/2025 (12:30 - 2:30) 9/25/2025 (PM) 09/25/2025
Building Final Inspection Issue TCO 9/25/2025 (12:30 - 2:30) 9/25/2025 (PM) 09/25/2025
Corrections:


Miscellaneous/Other
Comment Only
09/25/2025
Approved for temporary occupancy, pending correction of door that swings into path of travel for exiting. The door is being fitted with a stop and signage for push/pull. Call for final when this is completed.

Building Final Inspection Issue CO 09/26/2025
Corrections:


Miscellaneous/Other
Comment Only
09/26/2025
Due to the occupancy load of the rooms in hallway behind the glass door, the city allowed the contractor to put a push/ pull sign at door with a stop on door, so the door does not swing into the path of egress. This hardware and labeling has been installed. This space meets code requirements and is approved for the certificate of occupancy.