PRBD202501458
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Fire Inspection Final | Pending | |||
Building Final Inspection | Pending | |||
Framing Inspection | Partial Pass | 5/6/2025 (12:30 - 2:30) | 5/6/2025 (PM) | 05/06/2025 |
Corrections:
Miscellaneous/Other
Comment Only
05/06/2025
This was more of a consultation with contractor to adress the support and stiffness needed for the long free standing wall.
Contractor to add 3 stansions to framing of long wall and 1 at the pass through end of the adjoining wall.
Call for inspection when installed.
Ok to cover the other framed walls that were built and even to one side the long wall.
|
||||
Framing Inspection | Not Ready | 5/12/2025 (10:00 - 12:00) | 5/12/2025 (AM) | 05/12/2025 |
Corrections:
Miscellaneous/Other
Carried Forward
05/12/2025
The 24' wall and wing wall has to much wobble even with stancions added. Stanscions to be tightened down completely, and structural studs used around the stanscions need to be attached to top and bottom plates as well as fastened to the stansions better.
Architect was called and said hed come out and access the issue and come up with a remedy.
Leave wall open for reinspection. One side can be covered and fastened.
|
||||
Framing Inspection | Passed | 5/20/2025 (8:00 - 10:00) | 5/20/2025 (AM) | 05/20/2025 |
Corrections:
Miscellaneous/Other
Resolved
05/20/2025
The 24' wall and wing wall has to much wobble even with stancions added. Stanscions to be tightened down completely, and structural studs used around the stanscions need to be attached to top and bottom plates as well as fastened to the stansions better.
Architect was called and said hed come out and access the issue and come up with a remedy.
Leave wall open for reinspection. One side can be covered and fastened.
|
||||
Miscellaneous/Other
Comment Only
05/20/2025
Framing and wall support approved, ok to cover and finish.
|