PRBD202501458
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Partial Pass | 5/6/2025 (12:30 - 2:30) | 5/6/2025 (PM) | 05/06/2025 |
Corrections:
Miscellaneous/Other
Comment Only
05/06/2025
This was more of a consultation with contractor to adress the support and stiffness needed for the long free standing wall.
Contractor to add 3 stansions to framing of long wall and 1 at the pass through end of the adjoining wall.
Call for inspection when installed.
Ok to cover the other framed walls that were built and even to one side the long wall.
|
||||
Framing Inspection | Not Ready | 5/12/2025 (10:00 - 12:00) | 5/12/2025 (AM) | 05/12/2025 |
Corrections:
Miscellaneous/Other
Carried Forward
05/12/2025
The 24' wall and wing wall has to much wobble even with stancions added. Stanscions to be tightened down completely, and structural studs used around the stanscions need to be attached to top and bottom plates as well as fastened to the stansions better.
Architect was called and said hed come out and access the issue and come up with a remedy.
Leave wall open for reinspection. One side can be covered and fastened.
|
||||
Framing Inspection | Passed | 5/20/2025 (8:00 - 10:00) | 5/20/2025 (AM) | 05/20/2025 |
Corrections:
Miscellaneous/Other
Resolved
05/20/2025
The 24' wall and wing wall has to much wobble even with stancions added. Stanscions to be tightened down completely, and structural studs used around the stanscions need to be attached to top and bottom plates as well as fastened to the stansions better.
Architect was called and said hed come out and access the issue and come up with a remedy.
Leave wall open for reinspection. One side can be covered and fastened.
|
||||
Miscellaneous/Other
Comment Only
05/20/2025
Framing and wall support approved, ok to cover and finish.
|
||||
Fire Inspection Final | Not Ready | 7/15/2025 (12:30 - 2:30) | 7/15/2025 (PM) | 07/15/2025 |
Building Final Inspection | Failed | 7/15/2025 (12:30 - 2:30) | 7/15/2025 (PM) | 07/15/2025 |
Corrections:
Miscellaneous/Other
Carried Forward
07/15/2025
Not ready for final inspection... complete work to this space.
Additional items to be compled...
1)As per plans... install exit signs at both doorways leadng to exit from childrens room.
2)Install EM lighting at vestibule and childrens room and at other entry.
3)Install egg crates for plenum ceiling in childrens room and office.
|
||||
Building Final Inspection | Passed | 7/24/2025 (8:00 - 10:00) | 7/24/2025 (AM) | 07/24/2025 |
Corrections:
Miscellaneous/Other
Resolved
07/24/2025
Not ready for final inspection... complete work to this space.
Additional items to be compled...
1)As per plans... install exit signs at both doorways leadng to exit from childrens room.
2)Install EM lighting at vestibule and childrens room and at other entry.
3)Install egg crates for plenum ceiling in childrens room and office.
|
||||
Miscellaneous/Other
Comment Only
07/24/2025
Items correcre... final for this scope of work and oermit approved
|
||||
Fire Inspection Final | Passed | 7/24/2025 (8:00 - 10:00) | 7/24/2025 (AM) | 07/24/2025 |