Summary

PRBD202505826
Building
Finaled
MOAC MALL HOLDINGS LLC
Not Required
INTERIOR ALTERATION OF AN EXISTING RETAIL LEASE SPACE COLUMBIA RETAIL STORE LOCATED AT 106 WEST MARKET STREET, BLOOMINGTON, MN 55425
05/28/2025
06/26/2025
03/31/2026
10/02/2025

Locations

Permits

Permit Number: PRBD202505826

Building
Finaled
06/26/2025
03/31/2026

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Passed 7/18/2025 (12:30 - 2:30) 7/18/2025 (PM) 07/18/2025
Corrections:


Miscellaneous/Other
Comment Only
07/18/2025
Walls, soffits, and storefront... framing approved

Framing Inspection Passed 08/01/2025
Corrections:


Miscellaneous/Other
Comment Only
08/01/2025
Soffits and storefront framing... approved

Framing Inspection Passed 08/15/2025
Corrections:


Miscellaneous/Other
Comment Only
08/15/2025
Hard lid ceiling framing in smaller rooms ... approved

Building Final Inspection Partial Pass 9/24/2025 (10:00 - 12:00) 9/24/2025 (AM) 09/24/2025
Corrections:


Miscellaneous/Other
Carried Forward
09/24/2025
Corrections.... 1) firestop all penetrations at both sides of back corridor wall including against beam. 2) provide no storage stencil on walls at rear exit hallway. Will recheck these items at final inspection when space is layed out and set up.

Miscellaneous/Other
Comment Only
09/24/2025
Approved for stock and setup. See outstanding comments for corrections and set up final inspection when ready.

Fire Inspection Final Passed 10/1/2025 (12:30 - 2:30) 10/1/2025 (PM) 10/01/2025
Building Final Inspection Passed 10/1/2025 (12:30 - 2:30) 10/1/2025 (PM) 10/01/2025
Corrections:


Miscellaneous/Other
Resolved
10/01/2025
Corrections.... 1) firestop all penetrations at both sides of back corridor wall including against beam. 2) provide no storage stencil on walls at rear exit hallway. Will recheck these items at final inspection when space is layed out and set up.

Miscellaneous/Other
Comment Only
10/01/2025
All corrections completed. Final approved