Permit Application Status

PRBD202505901


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202505901
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Not Required
We are remodeling the existing space into a new Häagen-Dazs ice cream store in the Mall of America. 1. Plans have been approved by the Mall of America 2. Reviewed before the contractor is finalized 3. All plans are detailed in document, including Mechanical and Plumbing
05/29/2025
07/01/2025
05/05/2026
11/06/2025

Locations

Permits

Permit Number: PRBD202505901

Building
Finaled
07/01/2025
05/05/2026

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Progress Inspection Passed 8/6/2025 (8:00 - 10:00) 8/6/2025 (AM) 08/06/2025
Corrections:


Miscellaneous/Other
Comment Only
08/06/2025
The added mall smoke bulkhead , framing and sealing to this space is approved. Wall framing of what is currently in place approved. Call for electrical and sprinkler inspections or the ceiling, building above ceiling inspection to be performed when the trades inspections are approved.

Framing Inspection Passed w/ Conditions 8/19/2025 (8:00 - 10:00) 8/19/2025 (AM) 08/19/2025
Corrections:


Miscellaneous/Other
Comment Only
08/19/2025
Walls and above ceiling and ceiling framing.... approved See outstanding comments for correction.

Miscellaneous/Other
Outstanding
08/19/2025
2 floor drains and one 2" drain piping to be fire stopped... pictures to verify to be sent to inspector, or set up separate inspection and have access to space below.

Building Final Inspection Not Ready 10/30/2025 (12:30 - 2:30) 10/30/2025 (PM) 10/30/2025
SAME DAY CANCEL
Corrections:


Miscellaneous/Other
Comment Only
10/30/2025
Inspection canceled by contractor

Above Ceiling Inspection Passed 10/30/2025 (12:30 - 2:30) 10/30/2025 (PM) 10/30/2025
SAME DAY INSPECTION-CANCEL
Corrections:


Miscellaneous/Other
Comment Only
10/30/2025
The above ceiling inspection was already viewed at time of mechanical and framing inspection.

Fire Inspection Final Not Ready 10/30/2025 (12:30 - 2:30) 10/30/2025 (PM) 11/03/2025
CANCELED-Same Day
Building Final Inspection Partial Pass 11/4/2025 (10:00 - 12:00) 11/4/2025 (AM) 11/04/2025
Corrections:


Miscellaneous/Other
Carried Forward
11/04/2025
Corrections for final.... 1) complete storefront finishes at wall to ceiling and floor base as shown onplans. 2) install fire extinguisher to hang on wall at back of space 3) adjust rear door to properly close and latch. 4) provide " No storage " stencil an wall in front of electrical panel and transformer.

Miscellaneous/Other
Comment Only
11/04/2025
Approved for temp CO to get setup and get completed for the final. Electrical final scheduled for today, all permits to be final for C of O.

Fire Inspection Final Passed 11/4/2025 (10:00 - 12:00) 11/4/2025 (AM) 11/06/2025
Building Final Inspection Passed 11/7/2025 (12:30 - 2:30) 11/7/2025 (PM) 11/06/2025
Corrections:


Miscellaneous/Other
Resolved
11/06/2025
Corrections for final.... 1) complete storefront finishes at wall to ceiling and floor base as shown onplans. 2) install fire extinguisher to hang on wall at back of space 3) adjust rear door to properly close and latch. 4) provide " No storage " stencil an wall in front of electrical panel and transformer.

Miscellaneous/Other
Comment Only
11/06/2025
Corrections completed, final for this permit approved