Permit Application Status

PRBD202511133


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202511133
Building
Finaled
KRAUS-ANDERSON INC
Alteration/Repair/Replace
Business
Assembly, restaurants, bars, banquet halls, nightclubs
TENANT IMPROVEMENT Wing Stop - WORK INCLUDES BUT NOT LIMITED TO INTERIOR FINISHES, TOILET ROOMS, EXTENSION OF UTILITIES AND MODIFICATION TO ACCOMMODATE A NEW WINGSTOP RESTAURANT. NO EXTERIOR OR SITE MODIFICATIONS.
09/10/2025
10/22/2025
08/12/2026
02/13/2026

Locations

Permits

Permit Number: PRBD202511133

Building
Finaled
10/22/2025
08/12/2026

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Not Ready 12/16/2025 (8:00 - 10:00) 12/16/2025 (AM) 12/16/2025
This was a pre-framing and questions the contractor had. The contractor had the newest revised plans on site so I asked the contractor to submit the newest revised plans to the City. In addition, there was no notes from the engineer if the floor needs to be reinforced so i asked the contractor to verify with the engineer.
Corrections:


Miscellaneous/Other
Comment Only
12/16/2025
This was a pre-framing and questions the contractor had. The contractor had the newest revised plans on site so I asked the contractor to submit the newest revised plans to the City. In addition, there was no notes from the engineer if the floor needs to be reinforced so i asked the contractor to verify with the engineer.

Framing Inspection Passed 12/30/2025 (12:30 - 2:30) 12/30/2025 (PM) 12/30/2025
Framing approved
Corrections:


Miscellaneous/Other
Comment Only
12/30/2025
Framing approved

Above Ceiling Inspection Passed 2/9/2026 (8:00 - 10:00) 2/9/2026 (AM) 02/09/2026
Above ceiling approved
Corrections:


Miscellaneous/Other
Comment Only
02/09/2026
Above ceiling approved

Fire Inspection Final Passed 2/13/2026 (10:00 - 12:00) 2/13/2026 (AM) 02/12/2026
Building Final Inspection Issue CO 2/13/2026 (10:00 - 12:00) 2/13/2026 (AM) 02/13/2026
Corrections:


Miscellaneous/Other
Comment Only
02/13/2026
Approved for final and to open. Issue Certificate of Occupancy.