PRBD202512622
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Framing Inspection | Passed | 11/19/2025 (7:00 - 8:00) | 11/19/2025 (AM) | 11/19/2025 |
|
Corrections:
Miscellaneous/Other
Comment Only
11/19/2025
Framing at storefront, walls, and hard lid ceiling... approved
|
||||
| Progress Inspection | Passed | 2/11/2026 (10:00 - 12:00) | 2/11/2026 (AM) | 02/11/2026 |
|
Corrections:
Miscellaneous/Other
Comment Only
02/11/2026
Approved to bring in the stock that is already in the space.
Note of corrections to be completed...
1) install gypsum to apper wall in IT room at corner.
2) firestop the pipining that passs into kitchen from the Area of Refuge on both sides of wall.
3) install occupancy load signage, the occupancy load should be recalculated to reflect the actual space and occupants for this space.
|
||||
| Fire Inspection Final | Failed | 2/24/2026 (8:00 - 10:00) | 2/24/2026 (AM) | 02/24/2026 |
| Building Final Inspection | Issue CO | 2/24/2026 (8:00 - 10:00) | 2/24/2026 (AM) | 02/24/2026 |
|
Corrections:
Miscellaneous/Other
Comment Only
02/24/2026
All work completed and per plans and meets code. Final approved and ok to open to public.
|
||||
| Fire Inspection Final | Passed | 03/04/2026 | ||