PRBD202600373
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Framing Inspection | Passed w/ Conditions | 2/18/2026 (2:30 - 3:30) | 2/18/2026 (PM) | 02/18/2026 |
|
Corrections:
Miscellaneous/Other
Comment Only
02/18/2026
Wall framing approved pending fire stop at through floor electrical in the wall. This can be viewed at the final inspection.
|
||||
| Progress Inspection | Passed | 02/18/2026 | ||
|
Corrections:
Miscellaneous/Other
Comment Only
02/18/2026
This progress inspection is for the approval to set up and stock this space. Sprinklers are active, exiting and accessibility are compliant.
Approved for set up and stock only at this time. Call to set up final inspection prior to opening of space to public.
|
||||
| Building Final Inspection | Not Ready | 2/18/2026 (2:30 - 3:30) | 2/18/2026 (PM) | 02/18/2026 |
|
Corrections:
Miscellaneous/Other
Comment Only
02/18/2026
Not ready for final inspection at this time, see “progress inspection” dated 1/18/26 for stock and set up approval . Call for final inspection prior to opening this space to the public.
|
||||
| Fire Inspection Final | Not Ready | 2/18/2026 (2:30 - 3:30) | 2/18/2026 (PM) | 02/19/2026 |
| Building Final Inspection | Partial Pass | 2/20/2026 (10:00 - 12:00) | 2/20/2026 (AM) | 02/20/2026 |
|
Corrections:
Miscellaneous/Other
Carried Forward
02/20/2026
Corrections…
1) install directional exit sign with arrow point to direction of exit by office, and turn exit and knock out arrow at office location to direct to exit behind office.
2) install cover plate to floor outlet in back storage of space.
3) at curtains, they need to have a minimum 36” opening at all times during business hours for full visibility and access to second exit. Reinspection of final needed , approved to occupy space at this time.
|
||||
| Fire Inspection Final | Passed w/ Conditions | 2/20/2026 (10:00 - 12:00) | 2/20/2026 (AM) | 02/20/2026 |
| Add and adjust exit signs per building inspector | ||||
| Building Final Inspection | Passed | 3/11/2026 (10:00 - 12:00) | 3/11/2026 (AM) | 03/11/2026 |
|
Corrections:
Miscellaneous/Other
Resolved
03/11/2026
Corrections…
1) install directional exit sign with arrow point to direction of exit by office, and turn exit and knock out arrow at office location to direct to exit behind office.
2) install cover plate to floor outlet in back storage of space.
3) at curtains, they need to have a minimum 36” opening at all times during business hours for full visibility and access to second exit. Reinspection of final needed , approved to occupy space at this time.
|
||||
|
Miscellaneous/Other
Comment Only
03/11/2026
Corrections completed, final for this permit approved
|
||||