Permit Application Status

PRBD202601454


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202601454
Building
Permit(s) Issued
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Not Required
Interior finish improvements at Level 1 North Garden BOH F10
02/12/2026
02/23/2026
09/27/2026

Locations

Property
0102724310017

Address
8100 24TH AVE S, BLOOMINGTON, MN 55425

0102724310017
Mall of America

Permits

Permit Number: PRBD202601454

Building
Issued
02/23/2026
09/27/2026

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Fire Inspection Final Pending 3/31/2026 (8:00 - 10:00) 3/31/2026 (AM)
Framing Inspection Passed 3/2/2026 (8:00 - 10:00) 3/2/2026 (AM) 03/02/2026
Corrections:


Miscellaneous/Other
Comment Only
03/02/2026
Framing is existing and no changes done to framing. Gypsum replaced where removed, installation and fastening approved. Note: All joints need to be taped prior to the wood panels being installed.

Above Ceiling Inspection Passed 03/04/2026
Corrections:


Miscellaneous/Other
Comment Only
03/04/2026
Horizontal shaft wall ceiling at location of water damaged assembly... approved and ok to cover. Alls are being taped where gypsum board has been patched in, approved to install the wood protection cover to walls.

Framing Inspection Passed 3/12/2026 (10:00 - 12:00) 3/12/2026 (AM) 03/12/2026
Corrections:


Miscellaneous/Other
Comment Only
03/12/2026
Horizontal shaft repair to gypsum covering and shaft wall... approved

Building Final Inspection Passed 3/31/2026 (8:00 - 10:00) 3/31/2026 (AM) 03/31/2026
Corrections:


Miscellaneous/Other
Comment Only
03/31/2026
Final approved for this BOH corridor rebuild due to water damage.