PRBD202601454
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Fire Inspection Final | Pending | 3/31/2026 (8:00 - 10:00) | 3/31/2026 (AM) | |
| Framing Inspection | Passed | 3/2/2026 (8:00 - 10:00) | 3/2/2026 (AM) | 03/02/2026 |
|
Corrections:
Miscellaneous/Other
Comment Only
03/02/2026
Framing is existing and no changes done to framing. Gypsum replaced where removed, installation and fastening approved.
Note: All joints need to be taped prior to the wood panels being installed.
|
||||
| Above Ceiling Inspection | Passed | 03/04/2026 | ||
|
Corrections:
Miscellaneous/Other
Comment Only
03/04/2026
Horizontal shaft wall ceiling at location of water damaged assembly... approved and ok to cover.
Alls are being taped where gypsum board has been patched in, approved to install the wood protection cover to walls.
|
||||
| Framing Inspection | Passed | 3/12/2026 (10:00 - 12:00) | 3/12/2026 (AM) | 03/12/2026 |
|
Corrections:
Miscellaneous/Other
Comment Only
03/12/2026
Horizontal shaft repair to gypsum covering and shaft wall... approved
|
||||
| Building Final Inspection | Passed | 3/31/2026 (8:00 - 10:00) | 3/31/2026 (AM) | 03/31/2026 |
|
Corrections:
Miscellaneous/Other
Comment Only
03/31/2026
Final approved for this BOH corridor rebuild due to water damage.
|
||||