Permit Application Status

PRBD202602622


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202602622
Building
Finaled
INTERNATIONAL PLAZA
Alteration/Repair/Replace
Business
Interior tenant finish improvements at Suite 200 Farm Credit Administration
03/13/2026
03/27/2026
12/02/2026
06/05/2026

Locations

Permits

Permit Number: PRBD202602622

Building
Finaled
03/27/2026
12/02/2026

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Fire Inspection Final Not Ready 5/27/2026 (8:00 - 10:00) 5/27/2026 (AM) 05/27/2026
Corrections:


Miscellaneous/Other
Carried Forward
05/27/2026
Must test mag door drop on fire alarm activation, install sprinkler head in electrical room and cover open junction box, replace any missing ceiling tiles, add occupancy load in conference room, move exit sign to above stair B.

Building Final Inspection Partial Pass 5/27/2026 (8:00 - 10:00) 5/27/2026 (AM) 05/27/2026
Corrections:


Miscellaneous/Other
Carried Forward
05/27/2026
1) move exit sign at stair B to above the stair door 2) missing sprinkler head in electrical room, missing coverplate as well. 3) mag holds on entry to be tested with fire alarm. 4) install occupancy load sign to training assembly room. 5) install ceiling tiles where missing. Call for reinspection when ready, schedule fire and building inspectors.

Fire Inspection Final Passed 06/05/2026
Corrections:


Miscellaneous/Other
Outstanding
05/27/2026
Must test mag door drop on fire alarm activation, install sprinkler head in electrical room and cover open junction box, replace any missing ceiling tiles, add occupancy load in conference room, move exit sign to above stair B.

Building Final Inspection Passed 06/05/2026
Corrections:


Miscellaneous/Other
Resolved
06/05/2026
1) move exit sign at stair B to above the stair door 2) missing sprinkler head in electrical room, missing coverplate as well. 3) mag holds on entry to be tested with fire alarm. 4) install occupancy load sign to training assembly room. 5) install ceiling tiles where missing. Call for reinspection when ready, schedule fire and building inspectors.

Miscellaneous/Other
Comment Only
06/05/2026
Corrections completed and verified by fire inspector... approved for final.