Permit Application Status

PRBD202602834


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202602834
Building
Permit(s) Issued
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Not Required
Existing to remain throughout: structural, electrical, mechanical, plumbing, fire alarm and sprinkler, storefront, walls, and millwork. This is a temporary retail space in an interior mall. Scope of work consists of installing a temporary fitting room system, new wall paint finishes, new sales fixtures, and adjusting or relocating wall shelves in the existing stock system. Install an IT cabinet in existing Manager's office.
03/19/2026
03/24/2026
09/30/2026

Locations

Permits

Permit Number: PRBD202602834

Building
Issued
03/24/2026
09/30/2026

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Pending 4/9/2026 (8:00 - 10:00) 4/9/2026 (AM)
Fire Inspection Final Pending 4/9/2026 (8:00 - 10:00) 4/9/2026 (AM)
Above Ceiling Inspection Pending 4/9/2026 (8:00 - 10:00) 4/9/2026 (AM)
Building Final Inspection Pending 4/9/2026 (8:00 - 10:00) 4/9/2026 (AM)
Progress Inspection Passed 4/3/2026 (8:00 - 10:00) 4/3/2026 (AM) 04/03/2026
Corrections:


Miscellaneous/Other
Comment Only
04/03/2026
EM lighting and exiting approved. Ok to clean and set up space. Call for final inspection when space is set up and ready for business. See outstanding comments for corrections within the space.

Miscellaneous/Other
Outstanding
04/03/2026
Corrections... 1) Missing coverplates throughout storage and in sales area.install as needed 2) open electrical by panel area, get that closed up. 3) missing sprinkler escutcheons, install as needed 4) EM frog eye in storage is dangling, have that remounted 5) install ceiling tiles where missing 6) install fire extinguishers that are in current date status 7) verify Accessable fitting room location either at pipe and drape, or of the other 2 already set up as accessible fitting rooms. Sign for fitting room needs to be permanent mounted and not movable, not sure how that will work on pipe and drape fitting room.