Permit Application Status

PRCRF201908045


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCRF201908045
Roof, Commercial
Finaled
BETHANY FELLOWSHIP INC
Alteration/Repair/Replace
Remove existing roof membrane. Install ISO insulation to R-30. Install additional crickets between scuppers to move water from low spots. Fully adhere .60 mil EPDM roof membrane. Install outer perimeter metal and new scuppers & downspouts.
07/17/2019
07/19/2019
02/02/2020
10/09/2019

Locations

Permits

Permit Number: PRCRF201908045

Roofing
Finaled
07/19/2019
02/02/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Progress Inspection Passed 8/2/2019 (10:00 - 12:00) 8/2/2019 (AM) 08/02/2019
Progress - A. City inspector requested 2 areas to probe to conform existing insulation was ISO, and 3.5 inches thick. Contractor adding New 1.5 inch thick iso, fastened over existing 3.5 iso-exceeding R-30. 60 mil membrane confirmed, being adhered to iso board using FIRESTONE brand premium adhesive. Existing roof top mechanical units with existing curbs. Existing scuppers and wall drains to be modified by contractor. B. No permit card on site.
Building Final Inspection Not Ready 10/2/2019 (12:30 - 2:30) 10/2/2019 (PM) 10/02/2019
Building Final Inspection Passed 10/09/2019