Permit Application Status

PRCRF202008212


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCRF202008212
Roof, Commercial
Finaled
BETHANY FELLOWSHIP INC
Alteration/Repair/Replace
Remove both layers of existing roof. Leave existing 4" of insulation. add 1" of ISO insulation. Add crickets of insulation in bottom corners and between drains to move water to scuppers. Install factory fabricated pipeboots and pitch pans around conduit. Install additional insulation around HVAC units and exhaust flues. Fully adhere .60 mil EPDM roofing system. Install new scuppers and perimeter metal.
07/29/2020
08/10/2020
08/10/2021
10/29/2020

Locations

Permits

Permit Number: PRCRF202008212

Roofing
Finaled
08/10/2020
08/10/2021

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Building Final Inspection Passed 10/29/2020 (8:00 - 10:00) 10/29/2020 (AM) 10/29/2020