PRDE201807250
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Building Final Inspection | Pending | |||
|
Corrections:
Miscellaneous/Other
Outstanding
08/27/2018
Demolition of existing building. A. Bloomington HRA. B. Remove all footings, tunnels, concrete. C. Abondon all Wells, building water and fire sprinkler service ?, abondon all electrical service. ( seperate trade permits required )
|
||||
| Building Final Inspection | Passed | 8/27/2018 (10:00 - 12:00) | 8/27/2018 | 08/27/2018 |
| This site is completed. First inspection at wrong site - 3 sites. | ||||
|
Corrections:
Miscellaneous/Other
Carried Forward
08/27/2018
Demolition of existing building. A. Bloomington HRA. B. Remove all foundations footings, tunnels, concrete. C. Abondon all Wells, building water and fire sprinkler service ?, abondon all electrical service. ( seperate trade permits required )D. Visual of all footing and foundation excavation per building plan with open trench required. E. Remove slab on grade concrete ?
|
||||
|
Miscellaneous/Other
Outstanding
08/27/2018
This site completed, 3 sites, 2 remaining .
|
||||