PRDE201807377
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Building Final Inspection | Passed w/ Conditions | 8/28/2018 (8:00 - 10:00) | 8/28/2018 | 08/28/2018 |
Corrections:
Miscellaneous/Other
Comment Only
08/28/2018
Demo completed. Holes in floor already patched, plumbing contractor is sending pictures of installed metal cover at bottom and pins into concrete.
The MOA is taking responsibility for closing the hole in roof and insulation of opening , and installing metal pan with fireproofing the section to keep fire rating in tact.
The fireproofing of the exposed beams and bar joists/trusses will fall to the contractor that does the buildout of this space.
|