PREHP201813733
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| EH Final Inspection | Failed | 10/24/2019 (8:00 - 10:00) | 10/25/2019 (AM) | 10/24/2019 |
|
Corrections:
Outstanding
10/24/2019
- Provide an escutcheon around the abandoned gas line in the back hood.
- Seal the condensate line where it goes through the walk in cooler wall.
- Provide the missing tab for the cutting board.
- Provide soap and paper towels at all hand sinks.
- Seal the hole through the wall where the espresso drain line passes.
- Provide an air gap at least 1.5 times the diameter of the pipe on the copper drain line from the espresso machine.
- Raise the waste line from the glass washer to be off the floor to facilitate cleaning.
|
||||
|
Outstanding
10/24/2019
|
||||
| EH Final Inspection | Passed | 10/25/2019 (10:00 - 12:00) | 10/25/2019 (AM) | 10/29/2019 |
| EH Progress Inspection | Passed | 05/05/2020 | ||