Permit Application Status

PREHP202001542


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREHP202001542
Environmental Health Plan
Finaled
MOAC Mall Holdings LLC
Alteration/Repair/Replace
Interior remodel for new tenant - Mango Valley & Dragon's Breath.
02/19/2020
03/03/2020
04/24/2021
10/26/2020

Locations

Permits

Permit Number: PREHP202001542

Environmental Health Plan
Finaled
03/03/2020
04/24/2021

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
EH Final Inspection Issue TCO 3/13/2020 (10:00 - 12:00) 3/13/2020 (AM) 03/13/2020
Corrections:


Miscellaneous/Other
Carried Forward
03/13/2020
1. Remove all countertop coverings on front counter and back 2. Front display must be removable without use of tools. Replace brackets 3. Remove wooden bowls. All equipment must be nsf approved 4. Provide self closing bathroom door. Remove toe stop 5. Seal hose coming through wall 6. Sneeze shield does not comply with nsf requirements. Secure with approved materials. Must be nsf approved in permanent tenant 7. Provide soap paper towels at all hand sinks 8. Reinstall floor drain cover in janitor sink 9. Secure tanks on back 10. Obtain business license Temp to operate. Final scheduled for Monday 16 March. Ok to only use mango operation

EH Final Inspection Passed 08/20/2020
Corrections:


Miscellaneous/Other
Outstanding
03/13/2020
1. Remove all countertop coverings on front counter and back 2. Front display must be removable without use of tools. Replace brackets 3. Remove wooden bowls. All equipment must be nsf approved 4. Provide self closing bathroom door. Remove toe stop 5. Seal hose coming through wall 6. Sneeze shield does not comply with nsf requirements. Secure with approved materials. Must be nsf approved in permanent tenant 7. Provide soap paper towels at all hand sinks 8. Reinstall floor drain cover in janitor sink 9. Secure tanks on back 10. Obtain business license Temp to operate. Final scheduled for Monday 16 March. Ok to only use mango operation