Summary

PREHP202005710
Environmental Health Plan
Finaled
MOAC MALL HOLDINGS LLC
Other
Build out of a pizza kitchen and multiple bar areas for The Fair on 4th within the Mall of America.
06/08/2020
06/10/2020
08/29/2021
03/02/2021

Locations

Permits

Permit Number: PREHP202005710

Environmental Health Plan
Finaled
06/10/2020
08/29/2021

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
EH Progress Inspection Not Ready 6/11/2020 (12:30 - 2:30) 6/11/2020 (PM) 06/11/2020
Corrections:


Miscellaneous/Other
Outstanding
07/20/2020
1. Provide FRP or other approved materials for underside of concrete bar top. Surfaces must meet the minimum construction requirement 2. Provide a drink rail on back side of bar throughout 3. Floor in wait area must be approved materials, (quarry or ceramic tile) outside the main bar area where drinks and other items are being prepared. Provide handsink in that location 4. Area where pizza's will sit require an approved materials such as stainless steel. See plans for further details.

EH Progress Inspection Partial Pass 7/16/2020 (2:30 - 3:30) 7/16/2020 (PM) 07/20/2020
EH Progress Inspection Passed w/ Conditions 11/9/2020 (10:00 - 12:00) 11/9/2020 (AM) 11/16/2020
Miscellaneous/Other 1. Finish sealing off all wall penetrations throughout construction areas and back of house areas. 2. Provide running hot and cold running water to all sinks 3. Clean all construction and outstanding dirt and grime from all surfaces prior to stocking 4. Install all paper towels, soap and hand sink necessities for all sinks. 5. Provide splash guards on all hand sinks that are next to or adjacent to food products and production areas (outside bar area and other as needed) 6. Seal underside of bar pour in wait island area next to large bar 7. Fix patched FRP on underside of bar top in main bar 8. No hallway food or water storage or distribution allowed. OK to stock and train as well as soft opening to public. Contact this office and schedule final inspection for final CO of facility
Corrections:


Miscellaneous/Other
Outstanding
11/17/2020
1. Finish sealing off all wall penetrations throughout construction areas and back of house areas. 2. Provide running hot and cold running water to all sinks 3. Clean all construction and outstanding dirt and grime from all surfaces prior to stocking 4. Install all paper towels, soap and hand sink necessities for all sinks. 5. Provide splash guards on all hand sinks that are next to or adjacent to food products and production areas (outside bar area and other as needed) 6. Seal underside of bar pour in wait island area next to large bar 7. Fix patched FRP on underside of bar top in main bar 8. No hallway food or water storage or distribution allowed. OK to stock and train as well as soft opening to public. Contact this office and schedule final inspection for final CO of facility

EH Progress Inspection Passed w/ Conditions 11/17/2020
Added inspection to generate new correspondence. Previous inspection correspondence not working. AM 11/17
Corrections:


Miscellaneous/Other
Outstanding
11/17/2020
1. Finish sealing off all wall penetrations throughout construction areas and back of house areas. 2. Provide running hot and cold running water to all sinks 3. Clean all construction and outstanding dirt and grime from all surfaces prior to stocking 4. Install all paper towels, soap and hand sink necessities for all sinks. 5. Provide splash guards on all hand sinks that are next to or adjacent to food products and production areas (outside bar area and other as needed) 6. Seal underside of bar pour in wait island area next to large bar 7. Fix patched FRP on underside of bar top in main bar 8. No hallway food or water storage or distribution allowed. OK to stock and train as well as soft opening to public. Contact this office and schedule final inspection for final CO of facility

EH Final Inspection Partial Pass 11/19/2020 (Morning) 11/19/2020 (AM) 11/25/2020
Corrections:


Miscellaneous/Other
Comment Only
11/25/2020
1. Facility ok to proceed with soft opening, Once COVID protocol is lifted. Contact this office for final walk through once facility is approved for seating inside space

EH Final Inspection Passed 12/17/2020 (AM) 03/02/2021