PREHP202010755
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
EH Progress Inspection | Not Ready | 3/17/2021 (12:30 - 2:30) | 3/17/2021 (PM) | 04/07/2021 |
EH Final Inspection | Partial Pass | 8/9/2021 (PM) | 08/23/2021 | |
Corrections:
Miscellaneous/Other
Carried Forward
08/23/2021
Repair dish machine to function per code requirements. Do not use machine until fixed and approved by this department
|
||||
Miscellaneous/Other
Carried Forward
08/23/2021
Provide cover over electrical panel in dish area
|
||||
Miscellaneous/Other
Carried Forward
08/23/2021
All equipment must be 6 inches from side of hood. Move 6 inches, or provide stainless steel wall panel on wall next to gas line
|
||||
Miscellaneous/Other
Carried Forward
08/23/2021
Provide NSF approved stand for chemical bins under dish machine
|
||||
Miscellaneous/Other
Carried Forward
08/23/2021
Cut cutting boards and flip up top coolers to be able to be submersed in sanitizer at least 50% of the cutting board
|
||||
Miscellaneous/Other
Carried Forward
08/23/2021
Provide escutcheons around waste lines on hand sinks, electrical lines behind dish machine, and other areas as needed
|
||||
Miscellaneous/Other
Carried Forward
08/23/2021
Caulk wall area between janitor sink and wall
|
||||
Miscellaneous/Other
Carried Forward
08/23/2021
Set up and provide soap dispensers and paper towel dispensers at all hands sinks
|
||||
Miscellaneous/Other
Carried Forward
08/23/2021
Provide back drip edge on front bar countertop
|
||||
Miscellaneous/Other
Carried Forward
08/23/2021
Fix front pvc pipe for pop
|
||||
EH Progress Inspection | Passed w/ Conditions | 8/23/2021 (Morning) | 8/23/2021 (AM) | 09/22/2021 |
EH Final Inspection | Not Ready | 9/8/2021 (8:00 - 10:00) | 9/8/2021 (PM) | 09/20/2022 |
Corrections:
Miscellaneous/Other
Carried Forward
09/20/2022
Repair dish machine to function per code requirements. Do not use machine until fixed and approved by this department
|
||||
Miscellaneous/Other
Carried Forward
09/20/2022
Provide cover over electrical panel in dish area
|
||||
Miscellaneous/Other
Carried Forward
09/20/2022
All equipment must be 6 inches from side of hood. Move 6 inches, or provide stainless steel wall panel on wall next to gas line
|
||||
Miscellaneous/Other
Carried Forward
09/20/2022
Provide NSF approved stand for chemical bins under dish machine
|
||||
Miscellaneous/Other
Carried Forward
09/20/2022
Cut cutting boards and flip up top coolers to be able to be submersed in sanitizer at least 50% of the cutting board
|
||||
Miscellaneous/Other
Carried Forward
09/20/2022
Provide escutcheons around waste lines on hand sinks, electrical lines behind dish machine, and other areas as needed
|
||||
Miscellaneous/Other
Carried Forward
09/20/2022
Caulk wall area between janitor sink and wall
|
||||
Miscellaneous/Other
Carried Forward
09/20/2022
Set up and provide soap dispensers and paper towel dispensers at all hands sinks
|
||||
Miscellaneous/Other
Carried Forward
09/20/2022
Provide back drip edge on front bar countertop
|
||||
Miscellaneous/Other
Carried Forward
09/20/2022
Fix front pvc pipe for pop
|
||||
Miscellaneous/Other
Carried Forward
09/20/2022
Visited property with General Contractor for final. No access granted from operator. Will set up new inspection for final
|
||||
EH Final Inspection | VOID | 05/02/2025 | ||
Corrections:
Miscellaneous/Other
Outstanding
09/20/2022
Repair dish machine to function per code requirements. Do not use machine until fixed and approved by this department
|
||||
Miscellaneous/Other
Outstanding
09/20/2022
Provide cover over electrical panel in dish area
|
||||
Miscellaneous/Other
Outstanding
09/20/2022
All equipment must be 6 inches from side of hood. Move 6 inches, or provide stainless steel wall panel on wall next to gas line
|
||||
Miscellaneous/Other
Outstanding
09/20/2022
Provide NSF approved stand for chemical bins under dish machine
|
||||
Miscellaneous/Other
Outstanding
09/20/2022
Cut cutting boards and flip up top coolers to be able to be submersed in sanitizer at least 50% of the cutting board
|
||||
Miscellaneous/Other
Outstanding
09/20/2022
Provide escutcheons around waste lines on hand sinks, electrical lines behind dish machine, and other areas as needed
|
||||
Miscellaneous/Other
Outstanding
09/20/2022
Caulk wall area between janitor sink and wall
|
||||
Miscellaneous/Other
Outstanding
09/20/2022
Set up and provide soap dispensers and paper towel dispensers at all hands sinks
|
||||
Miscellaneous/Other
Outstanding
09/20/2022
Provide back drip edge on front bar countertop
|
||||
Miscellaneous/Other
Outstanding
09/20/2022
Fix front pvc pipe for pop
|
||||
Miscellaneous/Other
Outstanding
09/20/2022
Visited property with General Contractor for final. No access granted from operator. Will set up new inspection for final
|