Permit Application Status

PREHP202500444


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREHP202500444
Environmental Health Plan
Permit(s) Issued
BLMGTN SCHOOL DIST #271
Alteration/Repair/Replace
Remodel of existing kitchen and serving lines at Olson Middles School. This work will be done in conjunction with the remodel of Olson Middle School.
01/14/2025
05/13/2025
06/27/2026

Locations

Permits

Permit Number: PREHP202500444

Environmental Health Plan
Issued
05/13/2025
06/27/2026

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
EH Progress Inspection Pending
Corrections:


Miscellaneous/Other
Outstanding
12/29/2025
At final completion of the kitchen phase, move electrical conduit, and water supply plumbing inside of the finished wall.

Miscellaneous/Other
Outstanding
12/29/2025
Provide a drain line for the largest Combi oven to the floor drain terminating with an air gap.

Miscellaneous/Other
Outstanding
12/29/2025
Install strain reliefs as discussed before operating ovens.

Miscellaneous/Other
Outstanding
12/29/2025
OK per Environmental Health to operate Combi ovens once drain line and strain reliefs are in place as ordered. Other trades, including fire prevention must approve before use.

EH Progress Inspection Not Ready 8/20/2025 8/20/2025 (AM) 08/20/2025
EH Final Inspection Passed w/ Conditions 8/27/2025 8/27/2025 (AM) 08/27/2025
Corrections:


Miscellaneous/Other
Outstanding
08/27/2025
Provide soap and paper towels at all hand sinks prior to beginning operations.

Miscellaneous/Other
Outstanding
08/27/2025
Ok to open when ready.

EH Progress Inspection Partial Pass 12/29/2025 12/29/2025 (AM) 12/29/2025
Corrections:


Miscellaneous/Other
Carried Forward
12/29/2025
At final completion of the kitchen phase, move electrical conduit, and water supply plumbing inside of the finished wall.

Miscellaneous/Other
Carried Forward
12/29/2025
Provide a drain line for the largest Combi oven to the floor drain terminating with an air gap.

Miscellaneous/Other
Carried Forward
12/29/2025
Install strain reliefs as discussed before operating ovens.

Miscellaneous/Other
Carried Forward
12/29/2025
OK per Environmental Health to operate Combi ovens once drain line and strain reliefs are in place as ordered. Other trades, including fire prevention must approve before use.