Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Failed | 4/7/2017 (10:00 - 12:00) | 4/7/2017 | 04/07/2017 |
Corrections:
Miscellaneous/Other
Carried Forward
04/07/2017
Improper conductor sizing for 200 amp tap of a 1200 amp OCP.
|
||||
Miscellaneous/Other
Carried Forward
04/07/2017
Bonded neutral at meter enclosure- not allowed on load side of service.
|
||||
Electrical Rough-in Inspection | Partial Pass | 4/18/2017 (8:00 - 10:00) | 4/18/2017 | 04/18/2017 |
Corrections:
Miscellaneous/Other
Resolved
04/18/2017
Improper conductor sizing for 200 amp tap of a 1200 amp OCP.
|
||||
Miscellaneous/Other
Resolved
04/18/2017
Bonded neutral at meter enclosure- not allowed on load side of service.
|
||||
Miscellaneous/Other
Comment Only
04/18/2017
Ok to release feeder and install for new tenant meter.
|
||||
Miscellaneous/Other
Comment Only
04/18/2017
Additional inspections required for work I tenant space- possible final only.
|
||||
Electrical Rough-in Inspection | Passed | 5/2/2017 (12:30 - 2:30) | 5/2/2017 | 05/02/2017 |
Corrections:
Miscellaneous/Other
Comment Only
05/02/2017
RI - OK.
OK to stock
Need roof access for final
|
||||
Electrical Final Inspection | Passed w/ Conditions | 6/16/2017 (8:00 - 10:00) | 6/16/2017 | 06/16/2017 |
Corrections:
Miscellaneous/Other
Comment Only
06/16/2017
Tighten sealtight fittings wrench tight at new RTU HVAC equipment.
|