Permit Application Status

PREL201701937


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL201701937
Electrical
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Remodel
Retail buildout
03/29/2017
04/10/2017
05/30/2018
12/01/2017

Locations

Permits

Permit Number: PREL201701937

Electrical
Finaled
04/10/2017
05/30/2018

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Partial Pass 5/18/2017 (10:00 - 12:00) 4/19/2017 (AM) 04/20/2017
On-site meeting with electrician regarding service clearance issues.
Electrical Rough-in Inspection Partial Pass 5/11/2017 (12:30 - 2:30) 5/11/2017 05/11/2017
Corrections:


Miscellaneous/Other
Comment Only
05/11/2017
RI - walls, entry, and columns.

Electrical Rough-in Inspection Partial Pass 5/18/2017 (10:00 - 12:00) 5/18/2017 05/18/2017
Corrections:


Miscellaneous/Other
Comment Only
05/18/2017
RI - entry. Service - bond to water. Existing flex thru space needs strapping.

Electrical Rough-in Inspection Passed 5/22/2017 (8:00 - 10:00) 5/22/2017 05/22/2017
Corrections:


Miscellaneous/Other
Outstanding
05/22/2017
RI - pad ceilings. Service bond to water.

Electrical Final Inspection Partial Pass 5/26/2017 (8:00 - 10:00) 5/26/2017 05/26/2017
Corrections:


Miscellaneous/Other
Carried Forward
05/26/2017
Install track lights and complete cash wrap.

Electrical Final Inspection Partial Pass 6/1/2017 (8:00 - 10:00) 6/1/2017 06/01/2017
Corrections:


Miscellaneous/Other
Outstanding
05/26/2017
Install track lights and complete cash wrap.

Miscellaneous/Other
Outstanding
06/01/2017
All electrical games and equipment require UL listing and labeling or equivalent.

Electrical Final Inspection Partial Pass 6/2/2017 (12:30 - 2:30) 6/2/2017 06/05/2017
Corrections:


Miscellaneous/Other
Outstanding
06/05/2017
Independent evaluations required for unlisted electrical equipment.

Electrical Final Inspection Not Ready 6/8/2017 (10:00 - 12:00) 6/8/2017 06/08/2017
Electrical Final Inspection VOID 11/30/2017
Electrical Final Inspection Passed 12/1/2017 (10:00 - 12:00) 12/1/2017 12/01/2017