| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Electrical Rough-in Inspection | Partial Pass | 6/19/2017 (12:30 - 2:30) | 6/19/2017 | 06/19/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
06/19/2017
RI - lower level walls.
RI - 3 new 2nd floor guestrooms.
|
||||
| Electrical Rough-in Inspection | Partial Pass | 7/14/2017 (10:00 - 12:00) | 7/14/2017 | 07/14/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
07/14/2017
RI-first floor walls:
Buckhorn and Kids stores.
Restaurant and Grab/Go areas.
West hall (Magiquest).
|
||||
| Electrical Rough-in Inspection | Partial Pass | 8/8/2017 (7:00 - 8:00) | 8/8/2017 | 08/08/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
08/08/2017
RI - basement restroom ceiling.
RI - room 225 walls.
RI - 2nd floor restrooms and storerooms.
RI - 2nd floor SE wall of eating area.
RI - 2nd floor E walls of kitchen.
RI - Loose Moose ceiling (except bar and hostess areas.
RI - walls: Ben and Jerrys; Dunkin Doughnuts; Scoops; Candy store.
|
||||
| Electrical Rough-in Inspection | Partial Pass | 8/16/2017 (12:30 - 2:30) | 8/16/2017 | 08/16/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
08/16/2017
RI - hard-lid ceilings in Ben and Jerrys, Dunkin Donuts, kids theater, Buckets seating area.
Floor RI - water park bar.
|
||||
| Electrical Rough-in Inspection | Partial Pass | 8/18/2017 (12:30 - 2:30) | 8/18/2017 | 08/18/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
08/18/2017
RI - water park floor bonding in new bar and old whirlpool areas.
RI - LL restroom and hall hard-lid ceilings.
RI - suite 225 ceilings.
|
||||
| Electrical Rough-in Inspection | Partial Pass | 8/25/2017 (12:30 - 2:30) | 8/25/2017 | 08/25/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
08/25/2017
RI - water park floor bonding.
RI - MQ walls: 1st floor, east, store, start, candy.
RI - bowling alley walls.
|
||||
| Electrical Rough-in Inspection | Partial Pass | 8/31/2017 (12:30 - 2:30) | 8/31/2017 | 08/31/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
08/31/2017
RI - Ropes Course high wall.
RI - Ticket Booth walls
RI - Connector ceiling.
RI - Barnwood bar walls.
Verify listing and installation of led transformers.
|
||||
| Electrical Rough-in Inspection | Partial Pass | 9/1/2017 (12:30 - 2:30) | 9/1/2017 | 09/01/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
09/01/2017
RI - ceilings: Grab n Go, Barnwood Bar, Buckhorn (hard-lid), Ben and Jerry's (cloud).
|
||||
| Electrical Rough-in Inspection | Partial Pass | 9/7/2017 (12:30 - 2:30) | 9/7/2017 | 09/07/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
09/07/2017
RI - magi-quest store hard-lid.
RI-magi-quest E and NE arcade rooms lids.
RI-magi-quest cave walls.
RI-Scoops hard-lid.
RI-Treehouse ceilings.
|
||||
| Electrical Rough-in Inspection | Partial Pass | 9/22/2017 (12:30 - 2:30) | 9/22/2017 | 09/22/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
09/22/2017
RI - ceilings: redemption center and magiquest start rooms.
|
||||
| Electrical Rough-in Inspection | Partial Pass | 10/3/2017 (8:00 - 10:00) | 10/3/2017 | 10/03/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
10/03/2017
RI - Candy store ceiling.
|
||||
| Electrical Rough-in Inspection | Partial Pass | 10/4/2017 (8:00 - 10:00) | 10/4/2017 | 10/04/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
10/04/2017
RI - walls and soffit: Room 145.
|
||||
| Electrical Rough-in Inspection | Partial Pass | 10/11/2017 (Afternoon) | 10/11/2017 (PM) | 10/11/2017 |
|
Corrections:
Comment Only
10/18/2017
RI-ceilings: lower level offices (N. side).
|
||||
| Electrical Rough-in Inspection | Partial Pass | 10/18/2017 (10:00 - 12:00) | 10/18/2017 | 10/18/2017 |
|
Corrections:
Comment Only
10/11/2017
RI - Lower level offices ceilings (N. side).
|
||||
|
Miscellaneous/Other
Comment Only
10/18/2017
RI-ceilings: basement conference rooms, Ben and Jerry's, Buckhorn and Kid's store, bowling alley.
|
||||
| Electrical Rough-in Inspection | Partial Pass | 10/20/2017 (10:00 - 12:00) | 10/20/2017 | 10/20/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
10/20/2017
Site visit and questions at site. Bonding inspection- part pass. Terminations materials OK. At flange connections- provide a minimum of 4 points of contact- contractor to install "star" washers and to verify continuity. OK to continue- call for continuing inspections and verification of continuity at flanged connections.
|
||||
|
Miscellaneous/Other
Comment Only
10/20/2017
Bonding connections OK at steel grate
|
||||
| Electrical Rough-in Inspection | Partial Pass | 10/26/2017 (8:00 - 10:00) | 10/26/2017 | 10/26/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
10/26/2017
RI - ceilings: Paddle Bay; HAAW kitchen.
Laundry Equipment requires 3rd party evaluation (UL).
|
||||
| Electrical Rough-in Inspection | Partial Pass | 10/31/2017 (8:00 - 10:00) | 10/31/2017 | 10/31/2017 |
|
Corrections:
Miscellaneous/Other
Outstanding
10/31/2017
Bowling alley and lobby show equipment require field independent evaluation (UL).
|
||||
| Electrical Final Inspection | Partial Pass | 11/2/2017 (12:30 - 2:30) | 11/2/2017 | 11/02/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
11/02/2017
Final - lower level offices (except temp construction office).
|
||||
| Electrical Rough-in Inspection | Partial Pass | 11/2/2017 | 11/02/2017 | |
|
Corrections:
Comment Only
11/02/2017
Partial final - lower level offices, corridors, restrooms. Temp. construction office to inspect at final.
|
||||
| Electrical Final Inspection | Partial Pass | 11/14/2017 (8:00 - 10:00) | 11/14/2017 | 11/14/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
11/14/2017
Final - guest rooms and corridors, floors 8-3.
|
||||
| Electrical Rough-in Inspection | VOID | 11/15/2017 (12:30 - 2:30) | 11/15/2017 | 11/15/2017 |
| Electrical Final Inspection | Partial Pass | 11/15/2017 (8:00 - 10:00) | 11/15/2017 | 11/15/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
11/15/2017
Final - 2nd floor HAW kitchen.
Eco-Lab wiring to complete.
RTU's to inspect.
Verify listing of festoon lighting.
|
||||
| Electrical Final Inspection | Partial Pass | 11/15/2017 (12:30 - 2:30) | 11/15/2017 | 11/15/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
11/15/2017
Generator test.
|
||||
| Electrical Final Inspection | Partial Pass | 11/16/2017 (10:00 - 12:00) | 11/16/2017 | 11/16/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
11/16/2017
Final - 1st floor common areas: lobby, corridors, reception area.
Magi-quest electrical equipment requires independent evaluation.
Unlisted arcade games require independent evaluation.
|
||||
| Electrical Rough-in Inspection | Partial Pass | 11/17/2017 (8:00 - 10:00) | 11/17/2017 | 11/17/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
11/17/2017
Aquatics Bar.
Buckets kitchen.
Paddle Bay store.
Ben and Jerry's (change 3 - gfci outlets behind equipment to gfci breakers).
Dunking Donuts (Chang e 2 - gfci outlet to gfci breakers).
Loose Moose ( 2 - wall outlets by sink to gfci protect, repair existing flex connection under kitchen equipment and doghouse outlets.
|
||||
| Electrical Final Inspection | Partial Pass | 11/20/2017 (10:00 - 12:00) | 11/20/2017 | 11/24/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
11/24/2017
Independent evaluator for kid's theater called and stated he has completed his evaluation and it is compliant with UL standards and safe to operate.
Independent evaluation required for unlisted arcade games and unlisted magi-quest electrical stations.
|
||||
| Electrical Final Inspection | Partial Pass | 11/22/2017 (8:00 - 10:00) | 11/22/2017 | 11/24/2017 |
|
Corrections:
Miscellaneous/Other
Outstanding
11/24/2017
Sighned statement from independent evaluator stating compliance and safety received for water park slide and conveyor systems.
|
||||
| Electrical Final Inspection | Passed | 12/7/2017 (8:00 - 10:00) | 12/7/2017 | 12/07/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
12/07/2017
Laundry folder approved - ETL evaluated.
|
||||