PREL201703805
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Electrical Rough-in Inspection | Partial Pass | 6/13/2017 (10:00 - 12:00) | 6/13/2017 | 06/13/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
06/13/2017
Partial trench RI
|
||||
| Electrical Rough-in Inspection | Partial Pass | 6/23/2017 (8:00 - 10:00) | 6/23/2017 | 06/23/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
06/23/2017
Sauna tube RI
|
||||
| Electrical Rough-in Inspection | Partial Pass | 6/27/2017 (10:00 - 12:00) | 6/27/2017 | 06/27/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
06/27/2017
East side underground RI
|
||||
| Electrical Rough-in Inspection | Passed | 11/3/2017 (10:00 - 12:00) | 11/3/2017 | 11/03/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
11/03/2017
Trench and underground OK for new lighting at east parking location.
|
||||
| Electrical Final Inspection | Passed | 12/12/2017 (10:00 - 12:00) | 12/12/2017 | 12/12/2017 |
| Lighting Inspection Sign | Failed | 12/18/2017 (Afternoon) | 12/18/2017 (PM) | 12/15/2017 |
| Light levels well below plan levels. Sent e-mail to Mike at SRF. | ||||
|
Corrections:
Miscellaneous/Other
Outstanding
12/15/2017
Light levels are mosty above Code levels, except for a few areas. Light is as much as 60 percent below plan levels. Verify the fixture on the plan was actually installed or alternate, less performing ficture was used?
|
||||
| Lighting Inspection Sign | Passed | 05/25/2018 | ||
| Doubletree parking lot lighting (part) | ||||