Permit Application Status

PREL201706509


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL201706509
Electrical
Finaled
;
GWR MINNESOTA PROPERTY OWNER LLC
Repair/Replace
Replace VFD's for new pumps and piping for flow meters in water park mechanical rooms. Conduit for controls.
07/24/2017
07/26/2017
05/30/2018
12/01/2017

Locations

Permits

Permit Number: PREL201706509

Electrical
Finaled
07/26/2017
05/30/2018

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Partial Pass 9/26/2017 (10:00 - 12:00) 9/26/2017 09/26/2017
Corrections:


Miscellaneous/Other
Comment Only
09/26/2017
Installation of new VFD's for existing water park pumps.

Electrical Rough-in Inspection Partial Pass 10/3/2017 (10:00 - 12:00) 10/3/2017 10/03/2017
Corrections:


Miscellaneous/Other
Comment Only
10/03/2017
RI - bonding of handicap chairlifts to existing steel mesh in concrete (2).

Electrical Rough-in Inspection Not Ready 10/24/2017 (8:00 - 10:00) 10/24/2017 10/24/2017
Corrections:


Miscellaneous/Other
Comment Only
10/24/2017
LED lighting system, including control panels, require independent, 3rd party evaluation. All low voltage wiring to be done by licensed electrical contractor.

Electrical Rough-in Inspection Partial Pass 11/1/2017 (12:30 - 2:30) 11/1/2017 11/01/2017
Corrections:


Miscellaneous/Other
Comment Only
11/01/2017
Bonding of playground in water park. Independent evaluation required for tube conveyor system. Switches installed within 5' of water not allowed. Unlisted motors not part of control cabinet listing.

Electrical Rough-in Inspection Partial Pass 11/2/2017 (10:00 - 12:00) 11/2/2017 11/02/2017
Corrections:


Miscellaneous/Other
Outstanding
11/02/2017
Water park conveyor system requires independent UL evaluation. Only the control cabinet is UL listed, which does not include motors, switches, and controls external to control cabinet. Start/Stop switch within 5' of pool water is a code violation unless UL-listed for the purpose.

Electrical Rough-in Inspection Partial Pass 11/8/2017 (8:00 - 10:00) 11/7/2017 11/14/2017
Electrical Final Inspection Partial Pass 11/14/2017 (7:00 - 8:00) 11/14/2017 11/14/2017
Corrections:


Miscellaneous/Other
Outstanding
11/14/2017
Independent evaluations required for conveyor and lighting systems for big slide.

Electrical Final Inspection Passed 12/1/2017 12/01/2017
Corrections:


Comment Only
12/01/2017
Received independent electrical engineer evaluations from IEEC approving the electrical safety of the water slide lighting system and the conveyor system.