Permit Application Status

PREL201707946


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL201707946
Electrical
Finaled
THERMO KING CORPORATION
Repair/Replace
LED lighting retrofit and fixture replacement.(Thermo King)
08/25/2017
08/28/2017
05/19/2020
11/21/2019

Locations

Permits

Permit Number: PREL201707946

Electrical
Finaled
08/28/2017
05/19/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Final Inspection Partial Pass 8/5/2019 (12:30 - 2:30) 8/5/2019 (PM) 08/05/2019
I was directly to schedule 2 hours with both Tim and Eric by Jeff per Eric Hanson. mshulfer 07/26/2019 4:04 PM
Corrections:


Miscellaneous/Other
Comment Only
08/05/2019
Spot checks at 1st level office area with contractor. Verbal for two locations for box bonding. Verbal- when supporting 1900 box with grid wire- tie off at top and bottom.

Electrical Final Inspection Partial Pass 8/5/2019 (12:30 - 2:30) 8/5/2019 (PM) 08/05/2019
Corrections:


Miscellaneous/Other
Outstanding
08/05/2019
Found a few fixtures with ground tails not connect. Contractor aware of ones found.

Miscellaneous/Other
Outstanding
08/05/2019
Contractor will schedule an additional hour inspection to check findings and check a few more random fixtures through out.

Electrical Final Inspection Passed w/ Conditions 11/21/2019 (12:30 - 2:30) 11/21/2019 (PM) 11/21/2019
Corrections:


Miscellaneous/Other
Comment Only
11/21/2019
Spot check multiple locations for compliance. Few issues found have been corrected.