PREL201709558
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Final Inspection | Failed | 11/28/2017 | ||
Corrections:
Miscellaneous/Other
Carried Forward
11/28/2017
Left phone message for contact.
Work complete- need ceiling access.
Need to meet contractor on site.
Description on permit may not be entirely accurate.
|
||||
Electrical Final Inspection | Failed | 12/13/2017 (8:00 - 10:00) | 12/13/2017 | 12/13/2017 |
Corrections:
Miscellaneous/Other
Carried Forward
12/13/2017
Left phone message for contact.
Work complete- need ceiling access.
Need to meet contractor on site.
Description on permit may not be entirely accurate.
|
||||
Miscellaneous/Other
Carried Forward
12/13/2017
Contractor contact called inspector- contact was not able to access the space and will reschedule inspection.
|
||||
Electrical Final Inspection | Passed | 12/15/2017 (10:00 - 12:00) | 12/15/2017 | 12/15/2017 |
Corrections:
Miscellaneous/Other
Resolved
12/15/2017
Left phone message for contact.
Work complete- need ceiling access.
Need to meet contractor on site.
Description on permit may not be entirely accurate.
|
||||
Miscellaneous/Other
Resolved
12/15/2017
Contractor contact called inspector- contact was not able to access the space and will reschedule inspection.
|
||||
Miscellaneous/Other
Comment Only
12/15/2017
Permit description not accurate- no window shade power. Installation of one wall receptacle outlet for connections to a security power supply installed under desk. Limited view and access at desk- tenant occupied.
Visual ok.
|