Permit Application Status

PREL201709715


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL201709715
Electrical
Finaled
NORTH PAD DEVELOPMENT LLC
Alteration/Remodel
Electrical build-out for 1st and 2nd floor restrooms.
10/11/2017
10/11/2017
08/14/2018
02/15/2018

Locations

Permits

Permit Number: PREL201709715

Electrical
Finaled
10/11/2017
08/14/2018

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Partial Pass 10/13/2017 (12:30 - 2:30) 10/13/2017 10/13/2017
Corrections:


Miscellaneous/Other
Comment Only
10/13/2017
RI of bathrooms on 2nd level MOA 1C - OK including corridor Complete power, light and fire alarm cable Complete all demo Verify LED power source at subsequent inspection- Class 2 wiring used.

Electrical Rough-in Inspection Partial Pass 11/16/2017 (2:30 - 3:30) 11/16/2017 11/16/2017
Corrections:


Miscellaneous/Other
Comment Only
11/16/2017
RI - 1st floor restrooms and corridor.

Electrical Rough-in Inspection Passed 11/30/2017 (10:00 - 12:00) 11/30/2017 11/30/2017
Corrections:


Miscellaneous/Other
Comment Only
11/30/2017
RI - back stairs and 1st floor corridor. RI complete.

Electrical Final Inspection Partial Pass 12/22/2017 (8:00 - 10:00) 12/22/2017 12/22/2017
Corrections:


Miscellaneous/Other
Comment Only
12/22/2017
2nd floor bathrooms, family bathroom and personal needs room- part pass. OK to use/ occupy. Check LED drivers prior to final permit approval. Verbal- replace non- GFCI receptacle with GFCI protection at family room bathroom. Provide breaker lock-off at hand dryer.

Electrical Final Inspection Passed 2/15/2018 (10:00 - 12:00) 2/15/2018 02/15/2018