PREL201710118
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Partial Pass | 10/25/2017 (8:00 - 10:00) | 10/25/2017 | 10/25/2017 |
Corrections:
Miscellaneous/Other
Comment Only
10/25/2017
Phase one - wall RI OK
Trenching OK to floor boxes.
|
||||
Electrical Final Inspection | Not Ready | 11/14/2017 (12:30 - 2:30) | 11/14/2017 | 11/14/2017 |
Corrections:
Miscellaneous/Other
Carried Forward
11/14/2017
2 - exit lights added (required by building insp.)
Ceiling inspection required.
Floor outlets inaccessible.
Need to meet electrician for final.
|
||||
Electrical Final Inspection | Partial Pass | 10/3/2018 (10:00 - 12:00) | 10/3/2018 | 10/03/2018 |
Corrections:
Miscellaneous/Other
Comment Only
10/03/2018
2 - exit lights added (required by building insp.)
Ceiling inspection required.
Floor outlets inaccessible.
Need to meet electricia. n for final.
|
||||
LED driver is a recognized component and not listed/labeled for LED use
Resolved
12/12/2018
LED driver is a recognized component and not listed/labeled for LED use
|
||||
Provide documentation of LED lighting being a listed single assembly or unit
Resolved
12/12/2018
Provide documentation of LED lighting being a listed single assembly or unit
|
||||
Miscellaneous/Other
Comment Only
10/03/2018
Met contractor on site. All installation viewed are compliant. Remaining issues with LED drivers and lighting
|
||||
Electrical Final Inspection | Failed | 10/3/2018 | 10/03/2018 | |
Electrical Rough-in Inspection | Passed | 10/3/2018 (10:00 - 12:00) | 12/12/2018 | |
Electrical Final Inspection | Passed | 12/12/2018 |