PREL201710321
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Passed | 12/27/2017 (12:30 - 2:30) | 12/27/2017 | 12/27/2017 |
Corrections:
Miscellaneous/Other
Comment Only
12/27/2017
No building permit card on site.
RI of walls - OK
|
||||
Electrical Rough-in Inspection | Passed w/ Conditions | 2/9/2018 (8:00 - 10:00) | 2/9/2018 | 02/09/2018 |
Corrections:
Miscellaneous/Other
Comment Only
02/09/2018
3 offices - above ceiling OK - except remove sealtight from plenum air space.
Check at final.
|
||||
Electrical Final Inspection | Failed | 2/15/2018 (10:00 - 12:00) | 2/15/2018 | 02/16/2018 |
Corrections:
Maximum OCP per manufacturer nameplate exceeded- A/C unit “overfused”
Carried Forward
02/16/2018
Maximum OCP per manufacturer nameplate exceeded- A/C unit “overfused”
|
||||
Miscellaneous/Other
Carried Forward
02/16/2018
Install service receptacle within 25 foot of HVAC equipment.
|
||||
Electrical Final Inspection | Passed | 2/21/2018 (10:00 - 12:00) | 2/21/2018 | 02/22/2018 |
Per Tim, anytime inspection for Tuesday. Moe Amanda 02/16/2018 8:16 AM | ||||
Corrections:
Maximum OCP per manufacturer nameplate exceeded- A/C unit “overfused”
Resolved
02/22/2018
Maximum OCP per manufacturer nameplate exceeded- A/C unit “overfused”
|
||||
Miscellaneous/Other
Resolved
02/22/2018
Install service receptacle within 25 foot of HVAC equipment.
|