PREL201712082
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Final Inspection | Passed w/ Conditions | 1/29/2018 (10:00 - 12:00) | 1/29/2018 | 01/29/2018 |
Corrections:
Miscellaneous/Other
Comment Only
01/29/2018
Temporary power OK to premanufactured structure. Verbal correction- bond equipment grounding conductor to to enclosure at transfer switch. Plug check OK
Panel visual only- boned equipment grounding and isolated neutral.
|