PREL201803060
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Partial Pass | 07/09/2018 | ||
Corrections:
Miscellaneous/Other
Comment Only
07/09/2018
Site visit only.
|
||||
Electrical Rough-in Inspection | Partial Pass | 7/20/2018 (12:30 - 2:30) | 7/20/2018 | 07/20/2018 |
Corrections:
Miscellaneous/Other
Comment Only
07/20/2018
Above bar joist ceiling RI.
|
||||
Electrical Rough-in Inspection | Passed w/ Conditions | 8/13/2018 (Afternoon) | 8/13/2018 | 08/13/2018 |
Corrections:
Miscellaneous/Other
Comment Only
08/13/2018
Above ceiling OK at hard lid at cafeteria.
Above ceiling OK for power and lighting at corridor ceilings with new lighting.
No call for fire alarm cable work to date.
|
||||
Miscellaneous/Other
Outstanding
08/13/2018
Verbal to contractor and engineer- verify that existing egress illumination complies with NEC requirements for circuitry.
|
||||
Electrical Rough-in Inspection | Partial Pass | 8/14/2018 (Morning) | 8/14/2018 | 08/14/2018 |
Corrections:
Miscellaneous/Other
Comment Only
08/14/2018
Cafeteria hard lid at east- Above ceiling OK.
|
||||
Electrical Rough-in Inspection | Partial Pass | 8/17/2018 (12:30 - 2:30) | 8/17/2018 | 08/17/2018 |
Corrections:
Miscellaneous/Other
Comment Only
08/17/2018
Above drop ceiling at cafeteria OK
No call for FA cable inspection to date.
|
||||
Electrical Rough-in Inspection | Passed | 8/22/2018 (Afternoon) | 8/22/2018 | 08/22/2018 |
Electrical Final Inspection | Partial Pass | 8/22/2018 (Afternoon) | 8/22/2018 | 08/22/2018 |
Corrections:
Miscellaneous/Other
Comment Only
08/22/2018
Progress inspection for finals- lunchroom OK.
Corridors OK.
|
||||
Electrical Rough-in Inspection | Passed | 8/28/2018 (12:30 - 2:30) | 8/28/2018 | 08/28/2018 |
Corrections:
Miscellaneous/Other
Comment Only
08/28/2018
Eagle hallway- from top of stair at lunchroom to near main office- above ceiling OK.
|
||||
Electrical Final Inspection | Partial Pass | 8/30/2018 (12:30 - 2:30) | 8/30/2018 | 08/30/2018 |
Corrections:
Miscellaneous/Other
Comment Only
08/30/2018
Final - partial pass. OK to occupy. Walk through with site foreman. RTU 2 and 3. Mezzanine at room off lunchroom. Eagle hallway all OK.
Call for final when completed.
|
||||
Electrical Final Inspection | Passed | 9/7/2018 (8:00 - 10:00) | 9/7/2018 | 09/07/2018 |