Summary

PREL201804443
Electrical
Finaled
AL JAZARI INSTITUTE PROPERTY LLC
Repair/Replace
Install bathroom lighting
05/14/2018
05/17/2018
10/06/2019
04/09/2019

Locations

Permits

Permit Number: PREL201804443

Electrical
Finaled
05/17/2018
10/06/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Final Inspection Failed 11/8/2018 (10:00 - 12:00) 11/8/2018 (AM) 11/08/2018
Corrections:


Miscellaneous/Other
Carried Forward
11/08/2018
Work covered prior to inspection- remove and open t check visually. Verify cable secure and support. Verify luminarie secured to grid.

Miscellaneous/Other
Carried Forward
11/08/2018
Contractor to verify EM lighting requirements- exit lighting provided but no EM illumination.

Miscellaneous/Other
Carried Forward
11/08/2018
Provide Type TR receptacle outlets- with GFCI protection. Provide breaker lock off device for hand dryers. Provide access to electrical panel(s). Call for reinspection.

Electrical Final Inspection Failed 1/15/2019 (8:00 - 10:00) 1/15/2019 (AM) 01/15/2019
Corrections:


Miscellaneous/Other
Outstanding
01/15/2019
Work covered prior to inspection- remove and open t check visually. Verify cable secure and support. Verify luminarie secured to grid.

Miscellaneous/Other
Outstanding
01/15/2019
Contractor to verify EM lighting requirements- exit lighting provided but no EM illumination.

Miscellaneous/Other
Outstanding
01/15/2019
Provide Type TR receptacle outlets- with GFCI protection. Provide breaker lock off device for hand dryers. Provide access to electrical panel(s). Call for reinspection.

Miscellaneous/Other
Outstanding
01/15/2019
No call for reinspection. Luminaries are not attached to grid. Open box at ceiling of men's room. No EM lighting installation- EM is called out on plan.

Miscellaneous/Other
Outstanding
01/15/2019
Open line voltage wiring at women's bathroom to LED luminaries- install to code.

Electrical Final Inspection Failed 01/15/2019
Corrections:


Miscellaneous/Other
Carried Forward
01/15/2019
Work covered prior to inspection- remove and open t check visually. Verify cable secure and support. Verify luminarie secured to grid.

Miscellaneous/Other
Carried Forward
01/15/2019
Contractor to verify EM lighting requirements- exit lighting provided but no EM illumination.

Miscellaneous/Other
Carried Forward
01/15/2019
Provide Type TR receptacle outlets- with GFCI protection. Provide breaker lock off device for hand dryers. Provide access to electrical panel(s). Call for reinspection.

Miscellaneous/Other
Carried Forward
01/15/2019
No call for reinspection. Luminaries are not attached to grid. Open box at ceiling of men's room. No EM lighting installation- EM is called out on plan.

Miscellaneous/Other
Carried Forward
01/15/2019
Open line voltage wiring at women's bathroom- install LED alighting to code.

Electrical Final Inspection Passed w/ Conditions 4/9/2019 (8:00 - 10:00) 4/9/2019 (AM) 04/09/2019
Corrections:


Miscellaneous/Other
Comment Only
04/09/2019
Work covered prior to inspection- remove and open t check visually. Verify cable secure and support. Verify luminarie secured to grid.

Miscellaneous/Other
Comment Only
04/09/2019
Contractor to verify EM lighting requirements- exit lighting provided but no EM illumination.

Miscellaneous/Other
Outstanding
01/15/2019
Provide Type TR receptacle outlets- with GFCI protection. Provide breaker lock off device for hand dryers. Provide access to electrical panel(s). Call for reinspection.

Miscellaneous/Other
Comment Only
04/09/2019
PNo call for reinspection. Luminaries are not attached to grid. Open box at ceiling of men's room. No EM lighting installation- EM is called out on plan.

Miscellaneous/Other
Comment Only
04/09/2019
Open line voltage wiring at women's bathroom- install LED alighting to code.

Miscellaneous/Other
Comment Only
04/09/2019
Contractor to label all bathroom circuits. Contractor to provide breaker lock- offs for hand dryers for disconnect means.