PREL201804580
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Partial Pass | 10/11/2018 (8:00 - 10:00) | 10/11/2018 | 10/11/2018 |
Corrections:
All components used for “low voltage” lighting- shall be NRTL listed/certified and labeled as being for use with LED lighting.
Outstanding
10/11/2018
All components used for “low voltage” lighting- shall be NRTL listed/certified and labeled as being for use with LED lighting.
|
||||
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified
Outstanding
10/11/2018
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified
|
||||
Miscellaneous/Other
Comment Only
10/11/2018
Site visit- progress inspection- see notes on NRTL requirements of signs, equipment and LED lighting.
|
||||
Electrical Final Inspection | Passed | 10/16/2018 |