PREL201807203
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Partial Pass | 8/14/2018 (8:00 - 10:00) | 8/14/2018 | 08/14/2018 |
Corrections:
Miscellaneous/Other
Comment Only
08/14/2018
RI of walls OK
|
||||
Electrical Rough-in Inspection | Partial Pass | 9/5/2018 (8:00 - 10:00) | 9/5/2018 | 09/05/2018 |
Corrections:
Miscellaneous/Other
Comment Only
09/05/2018
RI OK at above ceiling at main store area.
|
||||
Electrical Rough-in Inspection | Passed | 9/10/2018 (8:00 - 10:00) | 9/10/2018 | 09/10/2018 |
Corrections:
Miscellaneous/Other
Comment Only
09/10/2018
Ceiling RI complete.
|
||||
Electrical Rough-in Inspection | Partial Pass | 10/5/2018 (12:30 - 2:30) | 10/5/2018 | 10/05/2018 |
Corrections:
All components used for “low voltage” lighting- shall be NRTL listed/certified and labeled as being for use with LED lighting.
Outstanding
10/05/2018
All components used for “low voltage” lighting- shall be NRTL listed/certified and labeled as being for use with LED lighting.
|
||||
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified
Outstanding
10/05/2018
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified
|
||||
Miscellaneous/Other
Comment Only
10/05/2018
RI OK a At above ceiling in drop ceiling area
|
||||
Electrical Rough-in Inspection | Passed | 10/10/2018 (12:30 - 2:30) | 10/10/2018 | 10/10/2018 |
Electrical Final Inspection | Partial Pass | 10/10/2018 (12:30 - 2:30) | 10/10/2018 | 10/10/2018 |
Corrections:
Miscellaneous/Other
Comment Only
10/10/2018
OK To bring in stock.
See all corrections and notes in regards to NRTL listing of display equipment and LED lighting.
|
||||
Electrical Final Inspection | Passed | 10/17/2018 (12:30 - 2:30) | 10/17/2018 | 10/17/2018 |
Corrections:
Miscellaneous/Other
Comment Only
10/17/2018
Final OK
|
||||
Electrical Final Inspection | Passed | 12/10/2018 | ||
Corrections:
Miscellaneous/Other
Comment Only
10/16/2018
Field evaluation by UL. Field labels have been installed. Report to follow.
|