Permit Application Status

PREL201807610


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL201807610
Electrical
Finaled
MOAC MALL HOLDINGS LLC
Other
ELECTRICAL BUILDOUT OF MATRIX - MOA
07/18/2018
07/25/2018
03/25/2019
09/26/2018

Locations

Permits

Permit Number: PREL201807610

Electrical
Finaled
07/25/2018
03/25/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Partial Pass 8/9/2018 (12:30 - 2:30) 8/9/2018 08/09/2018
Corrections:


Miscellaneous/Other
Comment Only
08/09/2018
RI OK @ underfloor/ walls and hard lid ceiling at ramped areas.

Electrical Rough-in Inspection Not Ready 09/10/2018
Corrections:


Miscellaneous/Other
Carried Forward
09/10/2018
Site visit only. Verify NRTL certification of all electrical equipment and materials.

Electrical Rough-in Inspection Failed 09/12/2018
Corrections:


Miscellaneous/Other
Comment Only
09/12/2018
Site visit only. Verify NRTL certification of all electrical equipment and materials.

Miscellaneous/Other
Comment Only
09/12/2018
Site visit only. Met with electrical contractor, general contractor, tenant and independent professional engineer to identify unlisted equipment, and wiring methods/materials.

All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified
Carried Forward
09/12/2018
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified- or independent third party evaluation by PE

Electrical Rough-in Inspection Passed 9/20/2018 (10:00 - 12:00) 9/20/2018 09/20/2018
Corrections:


All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified
Comment Only
09/20/2018
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified- or independent third party evaluation by PE

Electrical Final Inspection Passed w/ Conditions 9/26/2018 (8:00 - 10:00) 9/26/2018 09/26/2018
Corrections:


Miscellaneous/Other
Comment Only
09/26/2018
Independent third party evaluation received - final contingent on acceptance.