PREL201808639
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Electrical Rough-in Inspection | Passed | 9/27/2018 (12:30 - 2:30) | 9/27/2018 | 09/27/2018 |
| Electrical Final Inspection | Passed w/ Conditions | 9/27/2018 (12:30 - 2:30) | 9/27/2018 | 09/27/2018 |
|
Corrections:
Miscellaneous/Other
Comment Only
09/27/2018
Verbal to contractor: install lock on device at EM circuit.
Repair or replace EM luminaire at stock room exit door.
|
||||