PREL201808942
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Electrical Rough-in Inspection | Not Ready | 10/25/2018 (2:30 - 3:30) | 10/25/2018 | 10/25/2018 |
| Electrical Final Inspection | Not Ready | 10/25/2018 (2:30 - 3:30) | 10/25/2018 | 10/25/2018 |
| Electrical Rough-in Inspection | Passed | 10/26/2018 (2:30 - 3:30) | 10/26/2018 (PM) | 10/26/2018 |
| Electrical Final Inspection | Partial Pass | 10/26/2018 (2:30 - 3:30) | 10/26/2018 (PM) | 10/26/2018 |
|
Corrections:
Miscellaneous/Other
Comment Only
10/26/2018
Partial pass- all OK except entry signs and LED display lighting. Exit and EM OK.
Verbal replace beam clamp and verify sizing of existing GEC at existing distribution.
|
||||
| Electrical Final Inspection | Passed | 11/06/2018 | ||