Permit Application Status

PREL201809940


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL201809940
Electrical
Finaled
ACORN MINI-STORAGE XIV LLC
Alteration/Repair/Replace
Application submitted with rolled plans and credit card payment. Install 66 8' lights 144 4' storage lights, re-feed 4 RTUs, wire complete new office, new site lighting as per photometric.
08/28/2018
08/30/2018
03/17/2020
09/19/2019

Locations

Permits

Permit Number: PREL201809940

Electrical
Finaled
08/30/2018
03/17/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Partial Pass 10/15/2018 (12:30 - 2:30) 10/15/2018 10/15/2018
Corrections:


Miscellaneous/Other
Comment Only
10/15/2018
UG for service only.- ok

Electrical Rough-in Inspection Partial Pass 10/29/2018 (12:30 - 2:30) 10/29/2018 (PM) 10/29/2018
Corrections:


Miscellaneous/Other
Comment Only
10/29/2018
RI Office area only walls - ok

Electrical Rough-in Inspection Partial Pass 01/08/2019
Corrections:


Miscellaneous/Other
Comment Only
01/08/2019
Above ceiling- ok

Electrical Rough-in Inspection Failed 1/17/2019 (12:30 - 2:30) 1/17/2019 (PM) 01/17/2019
Corrections:


Miscellaneous/Other
Outstanding
01/18/2019
Install bushings on 3” EMT in service.

Miscellaneous/Other
Outstanding
01/18/2019
Install 2 ground rods and attach GEC to service.

Miscellaneous/Other
Outstanding
01/18/2019
480/277 panel needs to have grounds and neutrals separated.

Miscellaneous/Other
Outstanding
01/18/2019
Separately derived system needs to be bonded to GE system in building and bonded to secondary side of system. If done in panel install main bonding jumper .

Electrical Rough-in Inspection Passed 01/18/2019
Corrections:


Miscellaneous/Other
Resolved
01/18/2019
Install bushings on 3” EMT in service.

Miscellaneous/Other
Resolved
01/18/2019
Install 2 ground rods and attach GEC to service.

Miscellaneous/Other
Resolved
01/18/2019
480/277 panel needs to have grounds and neutrals separated.

Miscellaneous/Other
Resolved
01/18/2019
Separately derived system needs to be bonded to GE system in building and bonded to secondary side of system. If done in panel install main bonding jumper .

Electrical Final Inspection Partial Pass 1/18/2019 (12:30 - 2:30) 1/18/2019 (PM) 01/18/2019
Corrections:


Miscellaneous/Other
Resolved
01/22/2019
Compressor sprinkler wiring. For completion in phase 2.

Miscellaneous/Other
Resolved
01/22/2019
Repair ground to RTU’s

Miscellaneous/Other
Resolved
01/22/2019
FA completion

Miscellaneous/Other
Outstanding
01/18/2019
UG for exterior lights and gates .

Electrical Final Inspection Partial Pass 1/22/2019 (8:00 - 10:00) 1/22/2019 (AM) 01/22/2019
Corrections:


Miscellaneous/Other
Carried Forward
01/22/2019
Complete ground at water service.

Miscellaneous/Other
Carried Forward
01/22/2019
Outside UG needs to be completed when not frozen. Assume will be spring time when completed. Temp power ran around fence area.

Miscellaneous/Other
Comment Only
01/22/2019
Inside wiring other than outstanding issues - ok Will allow for TCO per BO determination. Phase 2 permits will be needed for other work being completed.

Lighting Inspection Sign Passed 2/18/2019 02/28/2019
Nick J. inspection 2.25.19
Electrical Final Inspection Partial Pass 5/29/2019 (2:30 - 3:30) 5/29/2019 (PM) 05/29/2019
Corrections:


Miscellaneous/Other
Comment Only
05/29/2019
Complete ground at water service.

Miscellaneous/Other
Resolved
05/29/2019
Outside UG needs to be completed when not frozen. Assume will be spring time when completed. Temp power ran around fence area.

Miscellaneous/Other
Comment Only
05/29/2019
UG piping covered. Light poles grounded- ok

Miscellaneous/Other
Carried Forward
05/29/2019
Need to have wet location splices for all in-ground boxes.

Electrical Final Inspection Passed 09/19/2019
Corrections:


Miscellaneous/Other
Comment Only
09/19/2019
Issues resolved.

Electrical Final Inspection Passed 09/19/2019
Corrections:


Miscellaneous/Other
Outstanding
05/29/2019
Need to have wet location splices for all in-ground boxes.