PREL201810073
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Partial Pass | 10/31/2018 (8:00 - 10:00) | 10/31/2018 (AM) | 10/31/2018 |
Corrections:
Miscellaneous/Other
Comment Only
10/31/2018
Above ceiling at existing clean room - power to filters. Call for additional inspection as needed/required.
|
||||
Electrical Rough-in Inspection | Passed | 11/16/2018 (12:30 - 2:30) | 11/16/2018 (PM) | 11/16/2018 |
Corrections:
Miscellaneous/Other
Comment Only
11/16/2018
Progress inspection OK. Relocated panel OK.
Outside HVAC equipment installation OK.
Building automation panel OK.
Sump pump panel OK.
GFPE for heat tape OK.
Obtain separate permit for tool installation.
|
||||
Electrical Final Inspection | Passed | 11/20/2018 (10:00 - 12:00) | 11/20/2018 (AM) | 11/20/2018 |
Corrections:
Miscellaneous/Other
Comment Only
11/20/2018
Clean room final OK.
Contractor to obtain separate permit for tool.
|