PREL201810309
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Partial Pass | 11/27/2018 (8:00 - 10:00) | 11/27/2018 (AM) | 11/27/2018 |
Corrections:
Miscellaneous/Other
Comment Only
11/27/2018
Progress inspection- rebar at footing for concrete encased electrode OK
|
||||
Electrical Rough-in Inspection | Partial Pass | 5/23/2019 (10:00 - 12:00) | 5/23/2019 (AM) | 05/23/2019 |
Corrections:
Miscellaneous/Other
Comment Only
05/23/2019
Site visit and walk through with contractor.
Progress inspection OK. Block walls and surface mounted raceways OK.
|
||||
Electrical Rough-in Inspection | Partial Pass | 6/18/2019 (10:00 - 12:00) | 6/18/2019 (AM) | 06/18/2019 |
Corrections:
Miscellaneous/Other
Comment Only
06/18/2019
Progress inspection- wall RI OK
|
||||
Electrical Rough-in Inspection | Partial Pass | 7/12/2019 (10:00 - 12:00) | 7/12/2019 (AM) | 07/12/2019 |
Corrections:
Miscellaneous/Other
Outstanding
07/12/2019
Verify AIC ratings at new panelboards and at 480 volt switchboard
|
||||
Miscellaneous/Other
Comment Only
07/12/2019
150 KVA transformer OK.
RI OK at canopy ceiling at bus drive.
Hard lid ceiling- partial OK
Small wall RI OK at walk way OK
|
||||
Electrical Rough-in Inspection | Partial Pass | 07/25/2019 | ||
Corrections:
Miscellaneous/Other
Comment Only
07/25/2019
Onsite meet, walkthrough to review opening. Bus turnaround.
|
||||
Miscellaneous/Other
Carried Forward
07/25/2019
Control panels need NRTL markings at bus entrance and exit points.
|
||||
Miscellaneous/Other
Carried Forward
07/25/2019
Exposed wiring in a few points need to be covered or pulled into piping.
|
||||
Electrical Rough-in Inspection | Partial Pass | 8/20/2019 (8:00 - 10:00) | 8/20/2019 (AM) | 08/20/2019 |
Corrections:
Miscellaneous/Other
Carried Forward
08/20/2019
Control panels need NRTL markings at bus entrance and exit points.
|
||||
Miscellaneous/Other
Comment Only
08/20/2019
Exposed wiring in a few points need to be covered or pulled into piping.
|
||||
Miscellaneous/Other
Comment Only
08/20/2019
Above ceilings RI OK at- transit area- police ceiling, bathrooms, and additional areas walked through with site foreman.
|
||||
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified
Carried Forward
08/20/2019
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified.
There are four gate industrial control cabinets that lack listing/labeling.
|
||||
Electrical Rough-in Inspection | Partial Pass | 9/3/2019 (8:00 - 10:00) | 9/3/2019 (AM) | 09/03/2019 |
Corrections:
Miscellaneous/Other
Carried Forward
09/03/2019
Control panels need NRTL markings at bus entrance and exit points.
|
||||
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified
Carried Forward
09/03/2019
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified.
There are four gate industrial control cabinets that lack listing/labeling.
|
||||
Miscellaneous/Other
Comment Only
09/03/2019
Above ceiling at transit corridor- RI OK.
|
||||
Electrical Rough-in Inspection | Partial Pass | 9/30/2019 (12:30 - 2:30) | 9/30/2019 (PM) | 09/30/2019 |
Corrections:
Miscellaneous/Other
Carried Forward
09/30/2019
Control panels need NRTL markings at bus entrance and exit points.
|
||||
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified
Carried Forward
09/30/2019
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified.
There are four gate industrial control cabinets that lack listing/labeling.
|
||||
Miscellaneous/Other
Comment Only
09/30/2019
Walk through with contractor OK
Install disconnect means as discussed.
Above ceilings RI OK
|
||||
Electrical Rough-in Inspection | Partial Pass | 10/7/2019 (12:30 - 2:30) | 10/7/2019 (PM) | 10/07/2019 |
Corrections:
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified
Resolved
10/07/2019
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified.
There are four gate industrial control cabinets that lack listing/labeling.
|
||||
Miscellaneous/Other
Resolved
10/07/2019
Control panels need NRTL markings at bus entrance and exit points.
|
||||
Miscellaneous/Other
Comment Only
10/07/2019
Partial pass- OK to occupy transit station common areas.
Need to verify testing procedure for egress illumination.
|
||||
Electrical Rough-in Inspection | Passed | 2/10/2020 (8:00 - 10:00) | 2/10/2020 (AM) | 02/10/2020 |
Corrections:
Miscellaneous/Other
Comment Only
02/10/2020
RI OK at existing elevator lobby
|
||||
Electrical Final Inspection | Passed | 4/16/2021 (10:00 - 12:00) | 4/16/2021 (AM) | 04/16/2021 |
Corrections:
Miscellaneous/Other
Comment Only
04/16/2021
Last site inspection 02/10/2020.
Walk through only.
Limited view and access at final.
Visual OK.
Final OK.
|
||||
Electrical Final Inspection | Passed | 04/16/2021 |