Summary

PREL201810309
Electrical
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Remodel
Metro Transit Station Renovation
09/05/2018
11/05/2018
10/13/2021
04/16/2021

Locations

Permits

Permit Number: PREL201810309

Electrical
Finaled
11/05/2018
10/13/2021

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Partial Pass 11/27/2018 (8:00 - 10:00) 11/27/2018 (AM) 11/27/2018
Corrections:


Miscellaneous/Other
Comment Only
11/27/2018
Progress inspection- rebar at footing for concrete encased electrode OK

Electrical Rough-in Inspection Partial Pass 5/23/2019 (10:00 - 12:00) 5/23/2019 (AM) 05/23/2019
Corrections:


Miscellaneous/Other
Comment Only
05/23/2019
Site visit and walk through with contractor. Progress inspection OK. Block walls and surface mounted raceways OK.

Electrical Rough-in Inspection Partial Pass 6/18/2019 (10:00 - 12:00) 6/18/2019 (AM) 06/18/2019
Corrections:


Miscellaneous/Other
Comment Only
06/18/2019
Progress inspection- wall RI OK

Electrical Rough-in Inspection Partial Pass 7/12/2019 (10:00 - 12:00) 7/12/2019 (AM) 07/12/2019
Corrections:


Miscellaneous/Other
Outstanding
07/12/2019
Verify AIC ratings at new panelboards and at 480 volt switchboard

Miscellaneous/Other
Comment Only
07/12/2019
150 KVA transformer OK. RI OK at canopy ceiling at bus drive. Hard lid ceiling- partial OK Small wall RI OK at walk way OK

Electrical Rough-in Inspection Partial Pass 07/25/2019
Corrections:


Miscellaneous/Other
Comment Only
07/25/2019
Onsite meet, walkthrough to review opening. Bus turnaround.

Miscellaneous/Other
Carried Forward
07/25/2019
Control panels need NRTL markings at bus entrance and exit points.

Miscellaneous/Other
Carried Forward
07/25/2019
Exposed wiring in a few points need to be covered or pulled into piping.

Electrical Rough-in Inspection Partial Pass 8/20/2019 (8:00 - 10:00) 8/20/2019 (AM) 08/20/2019
Corrections:


Miscellaneous/Other
Carried Forward
08/20/2019
Control panels need NRTL markings at bus entrance and exit points.

Miscellaneous/Other
Comment Only
08/20/2019
Exposed wiring in a few points need to be covered or pulled into piping.

Miscellaneous/Other
Comment Only
08/20/2019
Above ceilings RI OK at- transit area- police ceiling, bathrooms, and additional areas walked through with site foreman.

All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified
Carried Forward
08/20/2019
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified. There are four gate industrial control cabinets that lack listing/labeling.

Electrical Rough-in Inspection Partial Pass 9/3/2019 (8:00 - 10:00) 9/3/2019 (AM) 09/03/2019
Corrections:


Miscellaneous/Other
Carried Forward
09/03/2019
Control panels need NRTL markings at bus entrance and exit points.

All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified
Carried Forward
09/03/2019
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified. There are four gate industrial control cabinets that lack listing/labeling.

Miscellaneous/Other
Comment Only
09/03/2019
Above ceiling at transit corridor- RI OK.

Electrical Rough-in Inspection Partial Pass 9/30/2019 (12:30 - 2:30) 9/30/2019 (PM) 09/30/2019
Corrections:


Miscellaneous/Other
Carried Forward
09/30/2019
Control panels need NRTL markings at bus entrance and exit points.

All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified
Carried Forward
09/30/2019
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified. There are four gate industrial control cabinets that lack listing/labeling.

Miscellaneous/Other
Comment Only
09/30/2019
Walk through with contractor OK Install disconnect means as discussed. Above ceilings RI OK

Electrical Rough-in Inspection Partial Pass 10/7/2019 (12:30 - 2:30) 10/7/2019 (PM) 10/07/2019
Corrections:


All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified
Resolved
10/07/2019
All electrical equipment, machines or apparatus are required to be National Recognized Testing Laboratory certified/listed/labeled- NRTL certified. There are four gate industrial control cabinets that lack listing/labeling.

Miscellaneous/Other
Resolved
10/07/2019
Control panels need NRTL markings at bus entrance and exit points.

Miscellaneous/Other
Comment Only
10/07/2019
Partial pass- OK to occupy transit station common areas. Need to verify testing procedure for egress illumination.

Electrical Rough-in Inspection Passed 2/10/2020 (8:00 - 10:00) 2/10/2020 (AM) 02/10/2020
Corrections:


Miscellaneous/Other
Comment Only
02/10/2020
RI OK at existing elevator lobby

Electrical Final Inspection Passed 4/16/2021 (10:00 - 12:00) 4/16/2021 (AM) 04/16/2021
Corrections:


Miscellaneous/Other
Comment Only
04/16/2021
Last site inspection 02/10/2020. Walk through only. Limited view and access at final. Visual OK. Final OK.

Electrical Final Inspection Passed 04/16/2021