Permit Application Status

PREL201810908


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL201810908
Electrical
Finaled
CERES DEVELOPMENT LLC
Other
New 5 story hotel, Cambria Hotel and Suites
09/17/2018
12/06/2018
07/28/2020
01/30/2020

Locations

Permits

Permit Number: PREL201810908

Electrical
Finaled
12/06/2018
07/28/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Partial Pass 11/6/2019 (12:30 - 2:30) 12/12/2018
Corrections:


Miscellaneous/Other
Comment Only
12/12/2018
Questions at site.

Electrical Rough-in Inspection Partial Pass 6/4/2019 (8:00 - 10:00) 6/4/2019 (AM) 06/05/2019
Corrections:


Miscellaneous/Other
Comment Only
06/05/2019
4000 AMP 3 Phase 120/208 volt service OK to release to Xcel.

Miscellaneous/Other
Carried Forward
06/05/2019
All required clearance and egress to be reviewed and inspected at subsequent inspections.

Electrical Rough-in Inspection Partial Pass 6/13/2019 (8:00 - 10:00) 6/13/2019 (AM) 06/13/2019
Corrections:


Miscellaneous/Other
Carried Forward
06/13/2019
All required clearance and egress to be reviewed and inspected at subsequent inspections.

Miscellaneous/Other
Comment Only
06/13/2019
Progress inspection- review of preliminary RI of units

Electrical Rough-in Inspection Partial Pass 7/11/2019 (10:00 - 12:00) 7/11/2019 (AM) 07/11/2019
Corrections:


Miscellaneous/Other
Carried Forward
07/11/2019
All required clearance and egress to be reviewed and inspected at subsequent inspections.

Miscellaneous/Other
Comment Only
07/11/2019
Bond conductor at one wet niche luminarie OK. Verify if any metallic cup/anchors are to be installed- call for additional inspections as needed.

Miscellaneous/Other
Comment Only
07/11/2019
RI OK at 5th floor units for power and lighting.

Miscellaneous/Other
Carried Forward
07/11/2019
Verify who is responsible for temperature control wiring.

Electrical Rough-in Inspection Partial Pass 7/23/2019 (10:00 - 12:00) 7/23/2019 (AM) 07/23/2019
Corrections:


Miscellaneous/Other
Outstanding
07/11/2019
All required clearance and egress to be reviewed and inspected at subsequent inspections.

Miscellaneous/Other
Resolved
07/23/2019
Verify who is responsible for temperature control wiring.

Miscellaneous/Other
Comment Only
07/23/2019
5 th floor stat wiring - ok

Electrical Rough-in Inspection Partial Pass 7/25/2019 (12:30 - 2:30) 7/25/2019 (PM) 07/25/2019
Corrections:


Miscellaneous/Other
Comment Only
07/25/2019
4th floor stat wiring - ok

Electrical Rough-in Inspection Partial Pass 8/6/2019 (12:30 - 2:30) 8/6/2019 (PM) 08/06/2019
Corrections:


Miscellaneous/Other
Comment Only
08/06/2019
Questions at site in regards to egress lighting requirements. RI - 3rd Floor units OK.

Electrical Rough-in Inspection Partial Pass 8/19/2019 (12:30 - 2:30) 8/19/2019 (PM) 08/19/2019
Corrections:


Miscellaneous/Other
Comment Only
08/19/2019
2nd floor units -RI OK. Corridors at hard lids OK- check when whip is installed. Partial view at trenching at bollard lighting at building exterior

Electrical Rough-in Inspection Partial Pass 8/26/2019 (10:00 - 12:00) 8/26/2019 (AM) 08/26/2019
Corrections:


Miscellaneous/Other
Comment Only
08/26/2019
1st level- kitchen- wall RI OK. 1st floor 3- units RI OK.

Miscellaneous/Other
Carried Forward
08/26/2019
Inspector note: 1. Receptacle outlet for mirror in bathrooms requires AFCI/GFCI protection- must be readily accessible. 2. Bathroom receptacle circuit requires AFCI protection.

Electrical Rough-in Inspection Partial Pass 9/6/2019 (8:00 - 10:00) 9/6/2019 (AM) 09/06/2019
Corrections:


Miscellaneous/Other
Carried Forward
09/06/2019
Inspector note: 1. Receptacle outlet for mirror in bathrooms requires AFCI/GFCI protection- must be readily accessible. 2. Bathroom receptacle circuit requires AFCI protection.

Miscellaneous/Other
Comment Only
09/06/2019
Bonding inspection- OK No rebar in pool deck- # 8 copper ring around pool deck, 4 corners of the rebar at pool shell, connection to wet niche luminaire, one cup and handicap access all OK

Electrical Rough-in Inspection Partial Pass 9/19/2019 (12:30 - 2:30) 9/19/2019 (PM) 09/19/2019
Corrections:


Miscellaneous/Other
Comment Only
09/19/2019
Inspector note: 1. Receptacle outlet for mirror in bathrooms requires AFCI/GFCI protection- must be readily accessible. 2. Bathroom receptacle circuit requires AFCI protection.

Miscellaneous/Other
Comment Only
09/19/2019
First floor offices, bathrooms and common area wall RI- OK

Electrical Rough-in Inspection Partial Pass 10/10/2019 (8:00 - 10:00) 10/10/2019 (AM) 10/10/2019
Corrections:


Miscellaneous/Other
Comment Only
10/10/2019
1st Level East wing- RI OK at, Back wall bar, main public restrooms -walls and ceiling, guest laundry, boardroom walls & ceiling, Guest room suites, main laundry walls, bathroom wall, fitness center walls & ceiling and office area walls

Miscellaneous/Other
Comment Only
10/10/2019
1st Level East wing- RI OK at, Back wall bar, main public restrooms -walls and ceiling, guest laundry, boardroom walls & ceiling, Guest room suites, main laundry walls, bathroom wall, fitness center walls & ceiling and office area walls

Electrical Rough-in Inspection Partial Pass 10/23/2019 (8:00 - 10:00) 10/23/2019 (AM) 10/23/2019
Corrections:


Miscellaneous/Other
Comment Only
10/23/2019
Wall RI OK at meeting rooms and NE back of house areas

Electrical Rough-in Inspection Partial Pass 10/30/2019 (12:30 - 2:30) 10/30/2019 (PM) 10/30/2019
Corrections:


Miscellaneous/Other
Comment Only
10/30/2019
Questions at site

Electrical Rough-in Inspection Partial Pass 10/31/2019 (12:30 - 2:30) 10/31/2019 (PM) 10/31/2019
Electrical Rough-in Inspection Partial Pass 11/1/2019 (12:30 - 2:30) 11/1/2019 (PM) 11/01/2019
Corrections:


Miscellaneous/Other
Outstanding
11/01/2019
Verify listing of modular power outlets at furniture and listing and approval of furniture provided luminarie at clothes pole

Miscellaneous/Other
Comment Only
11/01/2019
Verify listing of modular power outlets at furniture and listing and approval of furniture provided luminarie at clothes pole

Miscellaneous/Other
Comment Only
11/01/2019
Hard lid at pool area OK

Miscellaneous/Other
Comment Only
11/01/2019
Plug check at units 531-545 and 526-544- verify AFCI/ panels locked

Electrical Rough-in Inspection Partial Pass 11/4/2019 (12:30 - 2:30) 11/4/2019 (PM) 11/04/2019
Corrections:


Miscellaneous/Other
Comment Only
11/04/2019
5th units - final OK except 524 not ready. Check AFCI at next inspection

Miscellaneous/Other
Comment Only
11/04/2019
Hard lid OK at first level corridor

Electrical Final Inspection Partial Pass 11/6/2019 (12:30 - 2:30) 11/6/2019 (PM) 11/06/2019
Corrections:


Miscellaneous/Other
Comment Only
11/06/2019
Spot checks / plug check units #426 through # 447. Some devices/ receptacles taped off for paint/wallpaper- Unable to check. Unit #424 not ready

Electrical Final Inspection Partial Pass 11/7/2019 (12:30 - 2:30) 11/7/2019 (PM) 11/07/2019
Corrections:


Miscellaneous/Other
Comment Only
11/07/2019
Units OK at #401 through #422. Some areas spot checks only- devices taped over for finishing. Note no receptacle outlet power in #408.

Miscellaneous/Other
Comment Only
11/07/2019
OK to Cover/pad upper level corridors

Electrical Final Inspection Partial Pass 11/14/2019 (12:30 - 2:30) 11/14/2019 (PM) 11/14/2019
Corrections:


Miscellaneous/Other
Comment Only
11/14/2019
Unit final Ok at 4th floor for plug test- except unit 424 and 408- no power

Electrical Final Inspection Partial Pass 11/15/2019 (12:30 - 2:30) 11/15/2019 (PM) 11/15/2019
Corrections:


Miscellaneous/Other
Comment Only
11/15/2019
1st level common area above ceiling partial RI OK

Miscellaneous/Other
Comment Only
11/15/2019
3rd floor units- spot checks for plug check Some areas devices are taped off for paint/wallpaper finishes- no access. Unit 324 no power Units 326 through 346 and 331 through 347 OK as noted. All tests of AFCI or GFCI protection at panelboards to be at subsequent inspection

Electrical Final Inspection Partial Pass 11/18/2019 (8:00 - 10:00) 11/18/2019 (AM) 11/18/2019
Corrections:


Miscellaneous/Other
Comment Only
11/18/2019
Plug checks on 3rd floor units- # 301- #322 3rd floor complete for plug checks of units...spot checking as unable to access all openings.

Electrical Final Inspection Partial Pass 11/19/2019 (10:00 - 12:00) 11/19/2019 (AM) 11/19/2019
Corrections:


Miscellaneous/Other
Outstanding
11/19/2019
Routine walkthrough of units- sent email to contractor and general contractor in relation to NRTL listing and labeling requirements of modular power and luminaires in built in furniture.

Electrical Final Inspection Partial Pass 11/20/2019 (10:00 - 12:00) 11/20/2019 (AM) 11/21/2019
Corrections:


Miscellaneous/Other
Comment Only
11/21/2019
Site visit only

Electrical Final Inspection Partial Pass 11/21/2019 (10:00 - 12:00) 11/21/2019 (AM) 11/21/2019
Corrections:


Miscellaneous/Other
Comment Only
11/21/2019
Progress inspection only

Electrical Rough-in Inspection Partial Pass 11/25/2019
Corrections:


Miscellaneous/Other
Comment Only
11/25/2019
Rooftop HVAC equipment - electrical OK

Electrical Final Inspection Partial Pass 12/10/2019 (8:00 - 10:00) 12/10/2019 (AM) 12/10/2019
Corrections:


Miscellaneous/Other
Comment Only
12/10/2019
Met contractor onsite- AFCI and GFCI testing at panelboards for all units 5th floor, 4th floor, 3rd floor & 2nd floor all OK.

Electrical Final Inspection Partial Pass 12/12/2019 (8:00 - 10:00) 12/12/2019 (AM) 12/12/2019
Corrections:


Miscellaneous/Other
Comment Only
12/12/2019
Plug checks at 2nd floor units -OK

Electrical Final Inspection Partial Pass 12/13/2019 (8:00 - 10:00) 12/13/2019 (AM) 12/13/2019
Corrections:


Miscellaneous/Other
Comment Only
12/13/2019
Above drop ceiling at kitchen, engineer office and break room.

Electrical Final Inspection Partial Pass 12/16/2019 (8:00 - 10:00) 12/16/2019 (AM) 12/16/2019
Corrections:


Miscellaneous/Other
Comment Only
12/16/2019
Progress inspection

Electrical Final Inspection Partial Pass 12/17/2019 (8:00 - 10:00) 12/17/2019 (AM) 12/17/2019
Corrections:


Miscellaneous/Other
Comment Only
12/17/2019
Progress inspection

Electrical Final Inspection Partial Pass 12/20/2019 (8:00 - 10:00) 12/20/2019 (AM) 12/20/2019
Corrections:


Miscellaneous/Other
Comment Only
12/20/2019
Walk through with contractor- Water room OK, laundry room equipment and disconnect means OK. Above ceilings at common areas and offices- OK. Elevator disconnect room OK. Kitchen cooler equipment OK. MUA unit visual OK.

Electrical Final Inspection Partial Pass 1/7/2020 (8:00 - 10:00) 1/7/2020 (AM) 01/07/2020
Corrections:


Miscellaneous/Other
Comment Only
01/07/2020
site visit only- questions at site.

Electrical Final Inspection Partial Pass 1/10/2020 (8:00 - 10:00) 1/10/2020 (AM) 01/14/2020
Corrections:


Miscellaneous/Other
Comment Only
01/14/2020
signs OK

Miscellaneous/Other
Carried Forward
01/14/2020
Walk through OK

Electrical Final Inspection Partial Pass 1/21/2020 (12:30 - 2:30) 1/21/2020 (PM) 01/23/2020
Corrections:


Miscellaneous/Other
Comment Only
01/23/2020
Walk through OK- Partial final Minor work left at pool and main lobby

Electrical Rough-in Inspection Passed 01/30/2020
Electrical Rough-in Inspection Passed 01/30/2020
Electrical Final Inspection Passed 01/30/2020